London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #9   Report Post  
Old June 28th 17, 04:08 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default Are any of the new Crossrail platforms curved?

On 2017\06\28 16:41, Recliner wrote:
Basil Jet wrote:
On 2017\06\28 15:19, Recliner wrote:
On Wed, 28 Jun 2017 14:54:28 +0100, "
wrote:

On 28.06.17 12:35, Recliner wrote:
On Wed, 28 Jun 2017 02:36:36 +0100, Basil Jet
wrote:


TCR looks curved to me.

https://youtu.be/9Mw0jCGl_HQ?t=1m24s

No, they're straight:

http://www.constructionenquirer.com/wp-content/uploads/8-Crossrail-Tottenham-Court-Road-3D-1.jpg

http://www.dr-sauer.com/files/drsauer/public/content/file/360/upload/222c-tcsup-002-full.png

I thought that the platforms would be straight as, IIRC, current
legislation stipulates only straight platforms.

Plus, it's a given that HSE would probably have conniptions if they saw
a curved platform. So, even if it is legally possible to build a curved
platform, it would not surprise me if the engineers and designers
decided simply to build it straight in order to avoid any
"complications."

They obviously don't have to be ruler straight, but I assume there are
rules for what (large) radius is allowed. You certainly wouldn't be
allowed to build anything like the Central Line Bank platforms today.


I don't think the rules have changed since Canada Water East London Line
platforms were built, and IIRC that is on a fair slope, so the rules can
be broken if TPTB feel like it.


Yes, I suppose they just have to seek a derogation, which is more likely to
be granted when adding things to an old line than when building an all-new
one.


.... although a new line weaved between the deep pile foundations of
London might be subject to more expensive geometrical constraints than a
new platform on an old line! Remember that Crossrail 2 was going to have
a station at Piccadilly Circus when it was tube gauge, but when they
went for mainline gauge there was no room for the platform tunnels.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
London Crossrail likely to work any better than Thameslink? e27002 aurora London Transport 32 January 29th 15 08:20 AM
new Stratford London Overground platforms Martin Petrov London Transport 9 April 7th 09 01:49 PM
New platforms at Stratford Martin Petrov London Transport 10 February 7th 09 09:31 PM
Kings Cross Underground - New Platforms lonelytraveller London Transport 2 October 7th 07 08:19 PM
Stratford - new DLR platforms Harry G London Transport 27 June 20th 07 09:19 PM


All times are GMT. The time now is 10:24 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017