London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #15   Report Post  
Old October 13th 17, 06:58 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Additional Jubilee and Northen trains deferred

In message , at 11:51:35 on
Thu, 12 Oct 2017, David Walters remarked:

I haven't used Bank for a while but it
was always overcrowded in the rush hour on the northern line platforms. Can't
see how they can improve that short of tunnelling a new diversion tube tunnel
like they did at Angel.


That's what they are doing, a new Northern line southbound tunnel.
https://tfl.gov.uk/travel-informatio...k-and-monument
is probably a better page.


"More than 200 engineers and staff will work on site at Bank 24 hours a
day until 2021."

Opted out of the working time directive, clearly.
--
Roland Perry


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
London Underground Lines - additional peak resources [email protected] London Transport 4 May 9th 09 01:29 PM
How does new car on Jubilee trains affect performance? Boltar London Transport 12 March 5th 06 12:22 PM
Terry Morgan and longer Jubilee line trains Bob London Transport 25 February 7th 06 01:33 AM
Jubilee Line trains running. burkey London Transport 1 December 29th 05 12:47 PM


All times are GMT. The time now is 01:57 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017