London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #7   Report Post  
Old February 26th 18, 07:17 AM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,715
Default Crossrail Railway Systems: End to End journey through Elizabethline tunnels

On 26/02/2018 07:55, Recliner wrote:
Basil Jet wrote:
On 2018\02\17 19:04, wrote:
https://youtu.be/d-RzWLxPQCs

I hadn't actually realised that the railway was on the surface between
Connaught Tunnel and North Woolwich. Amazing that they didn't build a
station here, with a travelator under Holt Road to the airport. This
must the be nearest that a railway has ever opened to an airport without
making any attempt to serve it.

There don't seem to be many ways for pedestrians to cross the railway
here either. The businesses in Factory Road are a stone's throw from the
houses around Holt Road and are not much further from the airport but
they almost have a shorter walking route under the Thames to Woolwich
than they do under Crossrail to the houses.


You might be interested in a report in today's Times:

Extract:

It is the issue that has had London City airport spotters perplexed for
years: why is it not connected to the £15 billion Crossrail line?

It has now emerged that the airport is about to embark on a year-long
feasibility study to make the case for adding a station to the route. The
east-west line takes a 26-mile subterranean route through the capital and
passes just 550ft from the airport terminal.

Robert Sinclair, chief executive of the airport, said the project would
examine the engineering case for a Crossrail station and present options to
its bosses. The study, which has yet to be commissioned, is expected to
take between one and two years.

It has previously been suggested that such a station would cost about £50
million. It would add two and a half minutes to journey times from one end
of the line to the other. Mr Sinclair said: “We understand that that won’t
happen overnight but we see a Crossrail station as a major strategic
imperative.”

From:
https://www.thetimes.co.uk/article/city-airport-to-broaden-its-horizons-as-tourist-hub-309g3nfx7?shareToken=2df295a0aa11a527a104da976cdd6 a7f


And it never occurred to them before?

--
Graeme Wall
This account not read.

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Thailand - railway through Market [email protected][_2_] London Transport 19 August 23rd 12 06:34 AM
Google Earth - a journey through space and time John Rowland London Transport 7 February 5th 09 10:07 AM
LU end-to-end journey data Tom Anderson London Transport 50 May 6th 07 09:40 AM
Starting a rail journey halfway through James Farrar London Transport 2 November 26th 06 11:13 PM
UK subway systems M J Forbes London Transport 14 August 19th 03 09:35 PM


All times are GMT. The time now is 06:04 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright 2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017