#1
![]() |
|||
|
|||
![]()
I was on the Met line platforms at moorgate for the first time in about 5
years today. The entire old Thameslink platform has been partitioned off. Is this to do with crossrail or is something else going on in there? |
#2
![]() |
|||
|
|||
![]()
On Mon, 21 May 2018 12:38:12 +0000 (UTC), wrote:
I was on the Met line platforms at moorgate for the first time in about 5 years today. The entire old Thameslink platform has been partitioned off. Is this to do with crossrail or is something else going on in there? Turning the old CWL into LU sidings. |
#3
![]() |
|||
|
|||
![]()
On Monday, 21 May 2018 13:44:11 UTC+1, Recliner wrote:
On Mon, 21 May 2018 12:38:12 +0000 (UTC), bol.com wrote: I was on the Met line platforms at moorgate for the first time in about 5 years today. The entire old Thameslink platform has been partitioned off. Is this to do with crossrail or is something else going on in there? Turning the old CWL into LU sidings. Is it nothing to do with the new trains that are due in September? I have no idea! |
#4
![]() |
|||
|
|||
![]()
In message , at
07:21:40 on Mon, 21 May 2018, Offramp remarked: I was on the Met line platforms at moorgate for the first time in about 5 years today. The entire old Thameslink platform has been partitioned off. Is this to do with crossrail or is something else going on in there? Turning the old CWL into LU sidings. Is it nothing to do with the new trains that are due in September? I have no idea! They use a completely different set of (subterranean) platforms. -- Roland Perry |
#5
![]() |
|||
|
|||
![]()
Roland Perry wrote:
In message , at 07:21:40 on Mon, 21 May 2018, Offramp remarked: I was on the Met line platforms at moorgate for the first time in about 5 years today. The entire old Thameslink platform has been partitioned off. Is this to do with crossrail or is something else going on in there? Turning the old CWL into LU sidings. Is it nothing to do with the new trains that are due in September? I have no idea! They use a completely different set of (subterranean) platforms. Indeed so. The Elizabeth line Moorgate and Liverpool St station entrances share one pair of much longer, deeper platforms to the southeast of the old CWL Moorgate platforms: https://goo.gl/images/5gg9sV |
#6
![]() |
|||
|
|||
![]()
In message
-septe mber.org, at 15:00:43 on Mon, 21 May 2018, Recliner remarked: I was on the Met line platforms at moorgate for the first time in about 5 years today. The entire old Thameslink platform has been partitioned off. Is this to do with crossrail or is something else going on in there? Turning the old CWL into LU sidings. Is it nothing to do with the new trains that are due in September? I have no idea! They use a completely different set of (subterranean) platforms. Indeed so. The Elizabeth line Moorgate and Liverpool St station entrances share one pair of much longer, deeper platforms to the southeast of the old CWL Moorgate platforms: https://goo.gl/images/5gg9sV Are trains for those due in September too? -- Roland Perry |
#7
![]() |
|||
|
|||
![]()
Offramp wrote:
On Monday, 21 May 2018 13:44:11 UTC+1, Recliner wrote: On Mon, 21 May 2018 12:38:12 +0000 (UTC), bol.com wrote: I was on the Met line platforms at moorgate for the first time in about 5 years today. The entire old Thameslink platform has been partitioned off. Is this to do with crossrail or is something else going on in there? Turning the old CWL into LU sidings. Is it nothing to do with the new trains that are due in September? I have no idea! LU doesn't have any new trains arriving in September. And the CWL to Moorgate have been transferred to LU, and no longer have any connection to the NR network. They are being turned into LU S stock sidings. |
#8
![]() |
|||
|
|||
![]()
On Mon, 21 May 2018 13:44:10 +0100
Recliner wrote: On Mon, 21 May 2018 12:38:12 +0000 (UTC), wrote: I was on the Met line platforms at moorgate for the first time in about 5 years today. The entire old Thameslink platform has been partitioned off. Is this to do with crossrail or is something else going on in there? Turning the old CWL into LU sidings. Surely that just requires laying some conductor rail? Plus there's nothing happening at Barbican, the line is still blocked with a partition wall at the west end of the station. |
#9
![]() |
|||
|
|||
![]()
wrote:
On Mon, 21 May 2018 13:44:10 +0100 Recliner wrote: On Mon, 21 May 2018 12:38:12 +0000 (UTC), wrote: I was on the Met line platforms at moorgate for the first time in about 5 years today. The entire old Thameslink platform has been partitioned off. Is this to do with crossrail or is something else going on in there? Turning the old CWL into LU sidings. Surely that just requires laying some conductor rail? Plus there's nothing happening at Barbican, the line is still blocked with a partition wall at the west end of the station. At the very least, several new crossovers and signals are needed. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
St Pancras temporary platforms - whats their future? | London Transport | |||
Brixton - whats happening? | London Transport | |||
Whats happened to strike threat? | London Transport | |||
Whats the quickest way.... | London Transport | |||
Whats up with charging £5.10 for an off-peak travel card? | London Transport |