On Wednesday, 18 July 2018 10:13:34 UTC+1, Recliner wrote:
Basil Jet wrote:

It's looking fairly likely that TfL will have to give away their diesel
trains before the electric trains are ready, and might end up
bustituting for a while.

https://www.londonreconnections.com/...nsport-update/


TfL certainly has a lot of looming issues. But I'd have thought it could
redeploy some of the 315s displaced from the Shenfield line as a very
short-term GOBLIN replacement fleet. Presumably Bombardier would have to
fund this, as it's months late with the new Aventras, and it currently
maintains the 315s anyway.


No you can't redeploy 315s. They do not have body mmounted CCTV cameras so you need to either retrofit them with this kit - pointless as they going to the scrapheap. You could fit platform CCTV and monitors at stations assuming there is space - this would take many months to do and get sign off. The new trains should be in service by then. The other alternative is to have dispatching staff on every platform - seems a rather extreme thing to do and no one will have budget for it. I really can't see any of this happening plus there are still a load of issues around whether the 315s even fit on the GOBLIN, whether LO drivers are trained on the stock etc etc.

--
Paul C
via Google
  #2   Report Post  
Old July 20th 18, 10:26 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2017
Posts: 329
Default Goblin latest

On Fri, 20 Jul 2018 02:24:35 -0700 (PDT)
Paul Corfield wrote:
On Wednesday, 18 July 2018 10:13:34 UTC+1, Recliner wrote:
Basil Jet wrote:
=20
It's looking fairly likely that TfL will have to give away their diesel=

=20
trains before the electric trains are ready, and might end up=20
bustituting for a while.
=20
https://www.londonreconnections.com/...-and-crossrai=

l-a-london-transport-update/
=20

=20
TfL certainly has a lot of looming issues. But I'd have thought it could
redeploy some of the 315s displaced from the Shenfield line as a very
short-term GOBLIN replacement fleet. Presumably Bombardier would have to
fund this, as it's months late with the new Aventras, and it currently
maintains the 315s anyway.


No you can't redeploy 315s. They do not have body mmounted CCTV cameras so =
you need to either retrofit them with this kit - pointless as they going to=
the scrapheap. You could fit platform CCTV and monitors at stations assum=
ing there is space - this would take many months to do and get sign off. Th=


I assume there are rules saying they can't just look out of a window when
closing the doors to check for obstructions?


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Latest score Mick Tully London Transport 7 July 21st 05 11:41 PM
Latest score Mick Tully London Transport 2 July 21st 05 09:49 PM
Latest minicab problem John Rowland London Transport 1 March 3rd 05 11:43 AM
Livingstone's latest wheeze John Rowland London Transport 31 October 27th 04 04:23 PM
Latest official Crossrail Line Diagram John Rowland London Transport 0 August 4th 04 10:10 AM


All times are GMT. The time now is 05:48 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017