London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #11   Report Post  
Old May 21st 04, 08:40 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5

"Graham J" wrote in message ...
I don't think too many people would find the situation very bizarre.
Whenever I am at a waiting at a station there always seems to be twice as
many trains going the other way :-)


I realise it would involve more tunneling and hence be more expensive but
surely a better solution would be to have trains go either HX - T123 - T5
or HX - T4 - T5? Obviously due to the single track at T4 they would then
all have to return T5 - T123.

B2003
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Heathrow to dover cruise terminal [email protected] London Transport 11 July 27th 07 11:02 PM
South Kensington to Heathrow Terminal 3 on Tuesday David of Broadway London Transport 29 October 29th 06 03:08 PM
Heathrow's Terminal " to be demolished Anon London Transport 0 November 13th 05 07:01 PM
Walking from Heathrow Terminal 4 Mark London Transport 3 June 26th 04 09:34 PM
Stansted Express Train - Express ride to a missed flight Mike Delorme London Transport 8 February 28th 04 05:42 PM


All times are GMT. The time now is 05:45 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017