London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old July 12th 19, 01:44 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2019
Posts: 895
Default ES: Crossrail at risk of being delayed even further

Crossrail is at major risk of having its opening delayed by even
longer than already feared and requiring even more public money, it
emerged today.

The crisis-hit line has already soared £2.8bn in cost to £17.6bn and
its opening is due between October 2020 and March 2021, the original
December 2018 date having been abandoned a year ago.

A series of high-level warnings by Crossrail’s independent watchdog,
the engineering firm Jacobs, were due to be made public by Transport
for London today.

It is understood that these will reveal that the project faces
additional “cost pressures and scheduling pressures” that make opening
it within the promised six-month window and expanded budget even more
challenging.

They will raise concerns that the opening schedule remains “too
optimistic” - though it is not thought that Jacobs calls for the date
to be delayed further.

Jacobs is understood to fear that a “number of longer-term risks may
not be receiving the focus necessary to ensure that the schedule and
cost are delivered in line with expectations”.

A “persistent trend” in rising costs, low productivity levels, missed
targets, and a lack of “robust” risk analysis are highlighted.
Concerns about the new signalling and the new £1bn fleet of trains
remain. One part of the scheme has been given a “red” rating.

Mayor Sadiq Khan strengthened the scrutiny powers of Jacobs to reveal
problems with Crossrail and increase the project’s transparency. The
alerts relate to Jacobs analysis throughout April and May.

.... continues in:

https://www.standard.co.uk/news/transport/crossrail-at-risk-of-being-delayed-even-further-a4188451.html
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Breaking news: Crossrail opening delayed Recliner[_3_] London Transport 8 August 31st 18 05:32 PM
TfL acknowledges contactless technology risk CJB London Transport 161 July 3rd 14 08:43 PM
Commuters suffer while Crowe inflates his ego even further [email protected] London Transport 23 May 31st 09 11:33 AM
Commuters suffer while Crowe inflates his ego even further [email protected] London Transport 42 May 28th 09 05:05 PM
"Flooding risk to Thames tunnels" Mizter T London Transport 4 September 30th 06 06:56 PM


All times are GMT. The time now is 03:51 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017