London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #14   Report Post  
Old December 12th 20, 04:41 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2018
Posts: 220
Default Have the 483s had their final run?

Graeme Wall wrote:
On 12/12/2020 14:03, Marland wrote:



007 returned to service today; finishing early at 1800 AIUI in order to
allow the 484 to continue test running.

Initially there were reports the line was closing again for the weekend for
engineering work but
007 looking very smart took up duties this morning.
Unfortunately it failed late morning and is back in the depot.
Hasn’t this overhaul taken 3 years? Hopefully it is something niggling that
can easily be fixed.



The 484 has made multiple trips to Shanklin under its own power, I believe;
but I've not seen any reports of it going through the tunnel, yet.

I think it was last Monday that Ryde Pier head had a few people wearing
HIVIZ and standing by survey instruments on tripods spread along the
platform so maybe clearances were being checked what with there being a
sharp curve into the station , possibly esplanade needs measuring as well.


Shouldn't they have done that before ordering the new trains?



I don’t think there will be a problem,after all normal stock albeit at the
smaller end of mainline loading gauge worked the line for the best part of
a century, but after 55 years of operating tube sized vehicles some re
adjustments would be understandable for any test run with tube stock being
narrower than subsurface. Some will needed anyway for unassisted wheeled
disability access is to be implemented. At the moment the guard is pretty
prompt at getting ramps for those who need them but can only be at one set
of doors at a time. Part of the upgrade of the infrastructure is to provide
level access to platforms though how they do it at Ryde Esplanade with its
curved platform will interesting, end doors only perhaps.
Pier station has a curve at the end but enough straight after to cope
with the length of trains.

GH

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
These writhing whales of the road have swung their hefty rear ends round our corners for the final time. Recliner[_2_] London Transport 246 August 11th 09 03:04 AM
Has Anyone Here Had A Unpleasant Experience On The Underground? Miss Prism London Transport 3 October 16th 07 08:31 PM
Have you noticed any reduction in School Run Congestion? Bob London Transport 7 October 2nd 06 07:58 PM
Ever had one of those weeks...? Solar Penguin London Transport 11 October 17th 04 03:28 PM
And you thought it was just London that had problems ... Ed Crowley London Transport 10 August 12th 03 10:52 AM


All times are GMT. The time now is 08:28 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright 2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017