London Banter

London Banter (https://www.londonbanter.co.uk/forum.php)
-   London Transport (https://www.londonbanter.co.uk/london-transport/)
-   -   LO lines to be named (https://www.londonbanter.co.uk/london-transport/17850-lo-lines-named.html)

Anna Noyd-Dryver April 16th 21 10:54 AM

Test tracks
 
Recliner wrote:
Marland wrote:
Recliner wrote:
Marland wrote:



There are more up to date ones which would have been a better choice such
as this one from the cab of an S stock train under test.

https://youtu.be/ZL8xZrY9SeU

Thanks, that was interesting. From the conversation, the 4th rail test
track is 4km long, and includes virtual stations and virtual tunnels. The
train has to do 500 miles (800km) of testing, so a 100 cycles.


One thing that strikes me from the various videos of the old Dalby test
route is that it is mainly straight. As more trains like the S stock get
constructed with full width connections between cars
or even articulations that could be an achilles heel.
The law of sod if you are testing something says it will be the bit that
wasn’t stressed that shows up an unexpected snag.


I know they have test rigs to repeatedly stress those connections to
destruction, with more violent movement in all directions than you'd want
to put a real train through.



Real service often shows up problems which testing hasn't; the latest
example is cracks in the yaw damper mountings of Northern's CAF units.
Several units are out of traffic, the rest being visually checked daily,
and some 319s are apparently being readied for a possible return to
service.


Anna Noyd-Dryver

Anna Noyd-Dryver April 16th 21 11:22 AM

Test tracks
 
Anna Noyd-Dryver wrote:
Recliner wrote:
Marland wrote:
Recliner wrote:
Marland wrote:


There are more up to date ones which would have been a better choice such
as this one from the cab of an S stock train under test.

https://youtu.be/ZL8xZrY9SeU

Thanks, that was interesting. From the conversation, the 4th rail test
track is 4km long, and includes virtual stations and virtual tunnels. The
train has to do 500 miles (800km) of testing, so a 100 cycles.


One thing that strikes me from the various videos of the old Dalby test
route is that it is mainly straight. As more trains like the S stock get
constructed with full width connections between cars
or even articulations that could be an achilles heel.
The law of sod if you are testing something says it will be the bit that
wasn’t stressed that shows up an unexpected snag.


I know they have test rigs to repeatedly stress those connections to
destruction, with more violent movement in all directions than you'd want
to put a real train through.



Real service often shows up problems which testing hasn't; the latest
example is cracks in the yaw damper mountings of Northern's CAF units.
Several units are out of traffic, the rest being visually checked daily,
and some 319s are apparently being readied for a possible return to
service.


https://twitter.com/garethdennis/status/1382968339870408707?s=21


Anna Noyd-Dryver





Graeme Wall April 16th 21 11:23 AM

Test tracks
 
On 16/04/2021 10:47, Marland wrote:
Recliner wrote:
Marland wrote:



There are more up to date ones which would have been a better choice such
as this one from the cab of an S stock train under test.

https://youtu.be/ZL8xZrY9SeU


Thanks, that was interesting. From the conversation, the 4th rail test
track is 4km long, and includes virtual stations and virtual tunnels. The
train has to do 500 miles (800km) of testing, so a 100 cycles.


One thing that strikes me from the various videos of the old Dalby test
route is that it is mainly straight. As more trains like the S stock get
constructed with full width connections between cars
or even articulations that could be an achilles heel.
The law of sod if you are testing something says it will be the bit that
wasn’t stressed that shows up an unexpected snag .

Obviously the S stock has been in service long enough now around the LU
system that they must have got it right in that case but there will be
other stock in the future.

I see plans for the Welsh based Global Centre For Rail Excellence were
recently published
and like the test tracks in the Czech Republic and Germany will have a
continuous circuit available.
so it could give Old Dalby competition .

https://nation.cymru/news/plans-subm...ence-in-wales/

GH


Only narrow gauge?

--
Graeme Wall
This account not read.


Recliner[_4_] April 16th 21 11:26 AM

Test tracks
 
Anna Noyd-Dryver wrote:
Anna Noyd-Dryver wrote:
Recliner wrote:
Marland wrote:
Recliner wrote:
Marland wrote:


There are more up to date ones which would have been a better choice such
as this one from the cab of an S stock train under test.

https://youtu.be/ZL8xZrY9SeU

Thanks, that was interesting. From the conversation, the 4th rail test
track is 4km long, and includes virtual stations and virtual tunnels. The
train has to do 500 miles (800km) of testing, so a 100 cycles.


One thing that strikes me from the various videos of the old Dalby test
route is that it is mainly straight. As more trains like the S stock get
constructed with full width connections between cars
or even articulations that could be an achilles heel.
The law of sod if you are testing something says it will be the bit that
wasn’t stressed that shows up an unexpected snag.

I know they have test rigs to repeatedly stress those connections to
destruction, with more violent movement in all directions than you'd want
to put a real train through.



Real service often shows up problems which testing hasn't; the latest
example is cracks in the yaw damper mountings of Northern's CAF units.
Several units are out of traffic, the rest being visually checked daily,
and some 319s are apparently being readied for a possible return to
service.


https://twitter.com/garethdennis/status/1382968339870408707?s=21


That looks like a pretty basic flaw that should have been found and fixed
long ago, particularly as it's happened before, in Ireland!

Roland Perry April 16th 21 12:43 PM

Test tracks
 
In message , at 11:26:45 on Fri, 16 Apr
2021, Recliner remarked:
Anna Noyd-Dryver wrote:
Anna Noyd-Dryver wrote:
Recliner wrote:
Marland wrote:
Recliner wrote:
Marland wrote:


There are more up to date ones which would have been a better
choice such
as this one from the cab of an S stock train under test.

https://youtu.be/ZL8xZrY9SeU

Thanks, that was interesting. From the conversation, the 4th rail test
track is 4km long, and includes virtual stations and virtual tunnels. The
train has to do 500 miles (800km) of testing, so a 100 cycles.


One thing that strikes me from the various videos of the old Dalby test
route is that it is mainly straight. As more trains like the S stock get
constructed with full width connections between cars
or even articulations that could be an achilles heel.
The law of sod if you are testing something says it will be the bit that
wasn’t stressed that shows up an unexpected snag.

I know they have test rigs to repeatedly stress those connections to
destruction, with more violent movement in all directions than you'd want
to put a real train through.

Real service often shows up problems which testing hasn't; the latest
example is cracks in the yaw damper mountings of Northern's CAF units.
Several units are out of traffic, the rest being visually checked daily,
and some 319s are apparently being readied for a possible return to
service.


https://twitter.com/garethdennis/status/1382968339870408707?s=21


That looks like a pretty basic flaw that should have been found and fixed
long ago, particularly as it's happened before, in Ireland!


Or similar failure modes on the Comet aircraft. Don't they teach this on
the first week of engineering courses, any more?
--
Roland Perry

Tweed[_2_] April 16th 21 01:14 PM

Test tracks
 
Roland Perry wrote:
In message , at 11:26:45 on Fri, 16 Apr
2021, Recliner remarked:
Anna Noyd-Dryver wrote:
Anna Noyd-Dryver wrote:
Recliner wrote:
Marland wrote:
Recliner wrote:
Marland wrote:


There are more up to date ones which would have been a better
choice such
as this one from the cab of an S stock train under test.

https://youtu.be/ZL8xZrY9SeU

Thanks, that was interesting. From the conversation, the 4th rail test
track is 4km long, and includes virtual stations and virtual tunnels. The
train has to do 500 miles (800km) of testing, so a 100 cycles.


One thing that strikes me from the various videos of the old Dalby test
route is that it is mainly straight. As more trains like the S stock get
constructed with full width connections between cars
or even articulations that could be an achilles heel.
The law of sod if you are testing something says it will be the bit that
wasn’t stressed that shows up an unexpected snag.

I know they have test rigs to repeatedly stress those connections to
destruction, with more violent movement in all directions than you'd want
to put a real train through.

Real service often shows up problems which testing hasn't; the latest
example is cracks in the yaw damper mountings of Northern's CAF units.
Several units are out of traffic, the rest being visually checked daily,
and some 319s are apparently being readied for a possible return to
service.

https://twitter.com/garethdennis/status/1382968339870408707?s=21


That looks like a pretty basic flaw that should have been found and fixed
long ago, particularly as it's happened before, in Ireland!


Or similar failure modes on the Comet aircraft. Don't they teach this on
the first week of engineering courses, any more?


It’s what happens as the result of “efficiency”. In days gone by there
would be a core of long serving engineers in an organisation with the
corporate memory of what not to do again. These days it’s fashionable to
talk up changing jobs every few years and easing out the older experienced
staff because they are expensive. The modern practice is to claim that
everything can be captured in a specification or a standard. Unfortunately
that’s not the case....

Many outfits are doomed to keep on repeating the same mistakes because of
high staff turnover.


Roland Perry April 16th 21 04:29 PM

Test tracks
 
In message , at 13:14:11 on Fri, 16 Apr
2021, Tweed remarked:

That looks like a pretty basic flaw that should have been found and fixed
long ago, particularly as it's happened before, in Ireland!


Or similar failure modes on the Comet aircraft. Don't they teach this on
the first week of engineering courses, any more?


It’s what happens as the result of “efficiency”. In days gone by there
would be a core of long serving engineers in an organisation with the
corporate memory of what not to do again. These days it’s fashionable to
talk up changing jobs every few years and easing out the older experienced
staff because they are expensive. The modern practice is to claim that
everything can be captured in a specification or a standard. Unfortunately
that’s not the case....

Many outfits are doomed to keep on repeating the same mistakes because of
high staff turnover.


I agree that corporate memory is important, but proper engineers
are taught universal memory - which can then be applied to
whatever corporate they are working for this week.
--
Roland Perry

Tweed[_2_] April 16th 21 06:27 PM

Test tracks
 
Roland Perry wrote:
In message , at 13:14:11 on Fri, 16 Apr
2021, Tweed remarked:

That looks like a pretty basic flaw that should have been found and fixed
long ago, particularly as it's happened before, in Ireland!

Or similar failure modes on the Comet aircraft. Don't they teach this on
the first week of engineering courses, any more?


It’s what happens as the result of “efficiency”. In days gone by there
would be a core of long serving engineers in an organisation with the
corporate memory of what not to do again. These days it’s fashionable to
talk up changing jobs every few years and easing out the older experienced
staff because they are expensive. The modern practice is to claim that
everything can be captured in a specification or a standard. Unfortunately
that’s not the case....

Many outfits are doomed to keep on repeating the same mistakes because of
high staff turnover.


I agree that corporate memory is important, but proper engineers
are taught universal memory - which can then be applied to
whatever corporate they are working for this week.


It would make for an extremely long degree course to impart the knowledge
learnt from a career.


[email protected] April 16th 21 07:15 PM

Test tracks
 
On 16/04/2021 19:27, Tweed wrote:
Roland Perry wrote:
In message , at 13:14:11 on Fri, 16 Apr
2021, Tweed remarked:

That looks like a pretty basic flaw that should have been found and fixed
long ago, particularly as it's happened before, in Ireland!

Or similar failure modes on the Comet aircraft. Don't they teach this on
the first week of engineering courses, any more?

It’s what happens as the result of “efficiency”. In days gone by there
would be a core of long serving engineers in an organisation with the
corporate memory of what not to do again. These days it’s fashionable to
talk up changing jobs every few years and easing out the older experienced
staff because they are expensive. The modern practice is to claim that
everything can be captured in a specification or a standard. Unfortunately
that’s not the case....

Many outfits are doomed to keep on repeating the same mistakes because of
high staff turnover.


I agree that corporate memory is important, but proper engineers
are taught universal memory - which can then be applied to
whatever corporate they are working for this week.


It would make for an extremely long degree course to impart the knowledge
learnt from a career.


Absolutely.

In technical areas corporate memory can be a judgement which is only
learnt by years of experience which cannot be learnt in the classroom or
from books and only by working with experienced elders can that
experience be retained. Sack those elders and that knowledge is lost
and can only be re-learnt.



Roland Perry April 17th 21 05:40 AM

Test tracks
 
In message , at 18:27:34 on Fri, 16 Apr
2021, Tweed remarked:
Roland Perry wrote:
In message , at 13:14:11 on Fri, 16 Apr
2021, Tweed remarked:

That looks like a pretty basic flaw that should have been found and fixed
long ago, particularly as it's happened before, in Ireland!

Or similar failure modes on the Comet aircraft. Don't they teach this on
the first week of engineering courses, any more?

It’s what happens as the result of “efficiency”. In days gone by there
would be a core of long serving engineers in an organisation with the
corporate memory of what not to do again. These days it’s fashionable to
talk up changing jobs every few years and easing out the older experienced
staff because they are expensive. The modern practice is to claim that
everything can be captured in a specification or a standard. Unfortunately
that’s not the case....

Many outfits are doomed to keep on repeating the same mistakes because of
high staff turnover.


I agree that corporate memory is important, but proper engineers
are taught universal memory - which can then be applied to
whatever corporate they are working for this week.


It would make for an extremely long degree course to impart the knowledge
learnt from a career.


Two different things.

A degree course can plant a 'memory' that metal fatigue is "a thing",
and encourage designing it out.

A career during which someone discovers metal fatigue in a particular
component of a particular assembly (and remembers that), has the
disadvantage that first of all there first has to be a failure of that
component, and secondly it may not be obvious simply from that memory
that the failure mode could also occur in a different component of a
different assembly.
--
Roland Perry


All times are GMT. The time now is 12:26 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright 2004-2006 LondonBanter.co.uk