Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#8
![]() |
|||
|
|||
![]()
Siddings at Neasden are still in use every day with sand trains to london
concrete depot. -- --------------------------------------------------------------------- "Are you still wasting your time with spam?... There is a solution!" Protected by GIANT Company's Spam Inspector The most powerful anti-spam software available. http://mail.spaminspector.com "Adrian Hudson" wrote in message m... Dave Arquati wrote in message ... John Rowland wrote: Hi all, According to http://www.chilternrailways.co.uk/pa...s/projects.asp , it will take 15 months to build and will complete in April 2005, so it should be under construction by now. I can't say I've noticed, but if it's on the north side of the railway it would be part of the Stadium construction site so wouldn't necessarily be discernable from the surrounding roads.. ANyone know more? It's on the southern side of the railway (east of the station I think). There's lots of work going on; last time I went past (last month) there were various pieces of heavy equipment around and most of the embankment had been dug up. And what was wrong with Neasden? Perfect site for a depot, one would have thought! :-) A. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Thameslink - Hornsey depot new application | London Transport | |||
Existing ELL depot - New Cross | London Transport | |||
new livery at Northfields depot | London Transport | |||
New depot plans not enough to satisfy residents | London Transport | |||
Wembley Park Depot | London Transport |