Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
|
|||
|
|||
Blockade of cross London Thameslink services from Saturday 11th September 2004 until 2005
Since BedPan / Thameslink electrification WH PSB has sucessfully
managed to run the same railway for 15 years without routing HST to Moorgate - or 319s to Junction Road Junction or any other non-electrified diverging route, why would you except this happen now. A couple of years ago a 319 failed south of Bedford, and another unit was despatched to collect it. This second unit was routed via a non-electrified connection between the up and down lines. The pan disengaged and brought the wires down. Some time before that a 319 was routed into the then new Platform 4 at Bedford station. So, yes, it happens all the time. Peter Goodland. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
North London Line blockade | London Transport | |||
HEATHROW AIRPORT - PUBLIC TRANSPORT SERVICES - 2005/2006 | London Transport | |||
Old cars or bikes wtd for Primrose Hill Summer Festival, Saturday 25th June 2005 | London Transport | |||
'Structrual damage' at Baker Street AM Friday 11th Feb | London Transport | |||
Open House Weekend 18th and 19th September 2004 | London Transport |