Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
Dave Arquati wrote in message ...
Jon Porter wrote: Dave Arquati wrote: Robin Mayes wrote: "Alan (in Brussels)" wrote in message ... According to the story "New East London Line 'done by 2010'" I saw the article in the Metro. Build a viaduct connecting Shorditch with the old North London at Bishopsgate, reinstate the track up to Dalston Junc, build 4 new stations, hardly a challange to be completed in 7 years time and a mere snip at £900m. Mind you compared to the Dome money bettre spent. How long did it take the Great Central to build the London extention. We seem to have lost the ability to do the simplest tasks in anything less than extortionate lengths of time and expend billions of pounds. Kevin |
#2
![]() |
|||
|
|||
![]() "Kevin" wrote in message om... Dave Arquati wrote in message ... Jon Porter wrote: Dave Arquati wrote: Robin Mayes wrote: "Alan (in Brussels)" wrote in message ... According to the story "New East London Line 'done by 2010'" I saw the article in the Metro. Build a viaduct connecting Shorditch with the old North London at Bishopsgate, reinstate the track up to Dalston Junc, build 4 new stations, hardly a challange to be completed in 7 years time and a mere snip at £900m. Mind you compared to the Dome money bettre spent. How long did it take the Great Central to build the London extention. We seem to have lost the ability to do the simplest tasks in anything less than extortionate lengths of time and expend billions of pounds. Kevin Yes, it is odd. The more accountants we have, the more things cost and the greateer the cost overun. |
#3
![]() |
|||
|
|||
![]()
"Tim Christian" wrote in message ...
"Kevin" wrote in message om... I saw the article in the Metro. Build a viaduct connecting Shorditch with the old North London at Bishopsgate, reinstate the track up to Dalston Junc, build 4 new stations, hardly a challange to be completed in 7 years time and a mere snip at £900m. Mind you compared to the Dome money bettre spent. How long did it take the Great Central to build the London extention. We seem to have lost the ability to do the simplest tasks in anything less than extortionate lengths of time and expend billions of pounds. Kevin Yes, it is odd. The more accountants we have, the more things cost and the greateer the cost overun. I was thinking, they have just had the 10th anniversary of the start of Eurostar. Eurostar started the year after the shuttle so channel tunnel trains started 1993. I think that the channel tunnel construction started in 1986. So in the same time that 2 running tunnels and a service tunnel 30 miles long, 2 terminals (one bigger than Heathrow Airport)were built they are going to build one viaduct, 4 stations and lay some track. Just think, if we had had this lot building the railways in the 1800's we would still be waiting for the completion on the London and Birmingham and the London to Bristol railways. Kevin |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
The East London Line is dead... Long live the East London Line | London Transport | |||
East London Line Extension | London Transport | |||
East London Line Extension | London Transport | |||
East London Line Project News | London Transport | |||
East London Line Extension (Who's gonna control it?) | London Transport |