Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#7
![]() |
|||
|
|||
![]()
S R wrote:
I can't see any reason why they'd diagram in such a way to be 376 only, but it could be done in theory, which is why I assume the OP asked the question. My reason for asking was concern that routes limited by platform length to 8-car trains would see all their peak-period 6- and 8-car trains replaced by 5-car trains. Which stations/routes are restricted to 8 cars? I might have been sensible to have designed the 376s with selective door opening to permit 10 car working to these stations. What actually is the history of the 12 car networker thing? I recall lots of platform lengthening happening at about the time the networkers were coming in, but I wasn't really paying attention at the time? What work was left undone that would have allowed 12 car trains, and what were the originally intended routes for them? Robin |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
SET 376 - A big disappointment | London Transport | |||
Class 376 train problems - South Eastern Trains | London Transport | |||
376 diagrams on SET website | London Transport | |||
I've been to London for business meetings and told myself that I'd be back to see London for myself. (rather than flying one day and out the next) I've used the tube briefly and my questions a | London Transport | |||
A couple of questions on Oystercards | London Transport |