London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #18   Report Post  
Old May 31st 05, 11:20 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 46
Default Paddington H&C was Circle Line "closing" from 2009?

Tom Anderson wrote:


Conversely, it is possible to gain access to the LUL platforms without
passing through the barriers by using the mainline access to the
suburban platforms and then crossing via the footbridge!


Worth knowing!


--
power to the people and the beats



I was sure that barriers were placed on the footbridge too...

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
district line closing time Larry London Transport 35 December 22nd 08 07:24 PM
Why do they keep closing Kings X in the rush hour? Marķa London Transport 15 July 6th 07 04:11 PM
"Circle Line should be up and running within a fortnight" [email protected] London Transport 4 July 21st 05 04:08 AM
London Transport Museum Closing CJG Now Thankfully Living In The North London Transport 8 November 26th 03 04:53 PM
Tube door opening and closing times Michael Bell London Transport 9 July 18th 03 08:03 PM


All times are GMT. The time now is 03:14 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017