London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old June 18th 05, 08:27 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 2
Default Heathrow Connect - can't connect !!



SB wrote:
Late last week and all this weekend 18/19-June-2005) the brand new
multimillion pound Heathrow Connect service has - well - not actually
connected with Heathrow. Due to the pathing problems (sorry signaling
problems) at Airport Junction the service has had great difficulty in
keeping to any sort of timetable. Indeed the delays have built up every
day until the last trains to/from Paddington/Heathrow have been
anything up to 45 minutes late. The problem is that coming out of or
going into the Airport the trains have to be switched from the slow
local lines across the fast Intercity lines. This has meant that all
trains have had to be halted to allow the Connect trains to enter/exit
the Airport Branch. The solution has been to terminate the Connect
trains at Hayes & Harlington and tell the pax to catch the 140 bus to
Heathrow. Well at least the bus is only 1.20 rather than 6 pounds for
this short one mile journey!! SB.


I thought the intention was to run the Heathrow bound trains the "wrong
way" through Airport Junction, ie. up the track between the main and
relief lines?

I have seen platform 5 used at Hayes rather a lot this week.

Also, does anyone know what FGWL is doing with the spare 165`s they`d
have freed up? Some of the rush hour trains could do with a bit of
lengthening...

Stu

  #2   Report Post  
Old June 19th 05, 11:51 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2004
Posts: 266
Default Heathrow Connect - can't connect !!

wrote:
SB wrote:
Late last week and all this weekend 18/19-June-2005) the brand new
multimillion pound Heathrow Connect service has - well - not actually
connected with Heathrow. Due to the pathing problems (sorry signaling
problems) at Airport Junction the service has had great difficulty in
keeping to any sort of timetable. Indeed the delays have built up every
day until the last trains to/from Paddington/Heathrow have been
anything up to 45 minutes late. The problem is that coming out of or
going into the Airport the trains have to be switched from the slow
local lines across the fast Intercity lines....


I thought the intention was to run the Heathrow bound trains the "wrong
way" through Airport Junction, ie. up the track between the main and
relief lines?

I have seen platform 5 used at Hayes rather a lot this week.


On Thursday they were alleging a points failure, and all trains were
turning at H & H. There were cancellations too - though the trains ran
non-stop to try to catch up instead of just being relabelled as the
next train.

Also, does anyone know what FGWL is doing with the spare 165`s they`d
have freed up? Some of the rush hour trains could do with a bit of
lengthening...


Already (last December) redeployed on longer-distance services.

Colin McKenzie

  #3   Report Post  
Old June 19th 05, 05:20 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2004
Posts: 16
Default Heathrow Connect - can't connect !!

wrote in message
ups.com...

Also, does anyone know what FGWL is doing with the spare 165`s they`d
have freed up? Some of the rush hour trains could do with a bit of
lengthening...


IIRC, they have (had?) three or four on loan from Chiltern, which one would
expect to be going back to them now.


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Jewellery can be purchased that will have holiday themes, likeChristmas that depict images of snowmen and snowflakes, and this type offashion jewellery can also be purchased with Valentine's Day themes, as wellas themes and gems that will go with you [email protected] London Transport 0 April 25th 08 11:06 PM
Oyster readers on Heathrow Connect James Farrar London Transport 14 July 19th 07 09:24 PM
Travelcards on Heathrow Express/Connect during LU closure [email protected] London Transport 23 July 3rd 05 06:42 PM
Heathrow Connect when? thoss London Transport 2 June 10th 05 01:15 PM
Heathrow Connect service michael hopkins London Transport 73 May 1st 05 06:12 PM


All times are GMT. The time now is 04:14 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017