On Wed, 03 Aug 2005 17:08:47 GMT, "Richard J."
wrote:

wrote:
I see the District & Picc must close through Hammersmith for
"important" or "urgent" work, something which can't delayed, yet
they haven't even finished the endless Earl's Court -
Whitechapel weekend shutdowns yet. Can't we have at least one
job finished before another starts?


Why would you want to delay track replacement between Barons Court and
Acton Town? The quality of the ride on that stretch is awful and has
led to speed restrictions.


Which is exactly the point. This section of track is in a dire state and
causes no end of problems - especially on the Piccadilly Line. The
remainder of the line is pretty reliable these days but the SSL managed
bits need work. There has been a lot of pressure placed on Metronet to
sort this stretch of railway out.
--
Paul C


Admits to working for London Underground!
  #13   Report Post  
Old August 3rd 05, 11:24 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2005
Posts: 258
Default Piccadilly Line back on Thursday...

If it was "dire" couldn't it have been done before the ECT - WCL stuff?


Of course one could ask LU after the never ending ECT - WCL work how
many extra trains, how quicker the journey time, how many more
reversing points etc will be provided? We can suspect the answer - a
big fat zero.

The in-car line diagrams on D Stock initially showed dates of
suspension, this may have been amended once, now there is a catch-all
sticker basically saying suspensions will occur UTFN at LU's request.

By the way, who's running the show, LU or Metronot/Tube Lies? Oh no
it's the latter, for the next 30 years....



Paul Corfield wrote:
On Wed, 03 Aug 2005 17:08:47 GMT, "Richard J."
wrote:

wrote:
I see the District & Picc must close through Hammersmith for
"important" or "urgent" work, something which can't delayed, yet
they haven't even finished the endless Earl's Court -
Whitechapel weekend shutdowns yet. Can't we have at least one
job finished before another starts?


Why would you want to delay track replacement between Barons Court and
Acton Town? The quality of the ride on that stretch is awful and has
led to speed restrictions.


Which is exactly the point. This section of track is in a dire state and
causes no end of problems - especially on the Piccadilly Line. The
remainder of the line is pretty reliable these days but the SSL managed
bits need work. There has been a lot of pressure placed on Metronet to
sort this stretch of railway out.
--
Paul C


Admits to working for London Underground!


  #14   Report Post  
Old August 3rd 05, 11:58 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,158
Default Piccadilly Line back on Thursday...

Paul Corfield wrote:
On Wed, 03 Aug 2005 17:08:47 GMT, "Richard J."
wrote:


wrote:

I see the District & Picc must close through Hammersmith for
"important" or "urgent" work, something which can't delayed, yet
they haven't even finished the endless Earl's Court -
Whitechapel weekend shutdowns yet. Can't we have at least one
job finished before another starts?


Why would you want to delay track replacement between Barons Court and
Acton Town? The quality of the ride on that stretch is awful and has
led to speed restrictions.



Which is exactly the point. This section of track is in a dire state and
causes no end of problems - especially on the Piccadilly Line. The
remainder of the line is pretty reliable these days but the SSL managed
bits need work. There has been a lot of pressure placed on Metronet to
sort this stretch of railway out.


I'm sure that, given the choice, most people would rather have the work
completed at this point rather than delayed until later. It's good that
arrangement as been made to allow the use of Travelcards on HEx and
Heathrow Connect.

--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
East London Line *NOT* to re-open Thursday (15/04/10)! Mizter T London Transport 3 April 19th 10 03:21 PM
In Search Of Style on London Transport: ITV1 London, Thursday, 7:30pm to 8pm John Rowland London Transport 1 July 24th 05 01:40 PM
Strike next Thursday Chris! London Transport 4 April 30th 05 08:46 PM
Brian Hardy talks about Berlin U-Bahn and S-Bahn in St Albans on Thursday John Rowland London Transport 0 November 12th 03 12:41 AM


All times are GMT. The time now is 10:38 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017