Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#7
![]() |
|||
|
|||
![]() "Boltar" wrote in message ups.com... Maybe I'm missing something here , but given the southern section isn't actually a "line" but simply a route over pre-existing tracks , what exactly is the problem? They could send it to dover via bournemouth if they were so inclined. Seems to me all it requires is some pen pusher to rubber stamp it and a team of workers to spend a weekend putting some connecting track in at new cross and thats that. The hard parts as far as I can see are building the northern part and converting the current LUL line to 3rd rail. B2003 I understand there is a short stretch at Surrey Canal Rd, where the track and junctions needs to be reinstated, not sure if the formation is still available; and a modern 'gold plated' station built. Funding for this is not yet earmarked but may be in 2006/8 or sometime... Paul |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Charged more to cross London than Aberystwyth to London UPDATE | London Transport | |||
The East London Line is dead... Long live the East London Line | London Transport | |||
North London Line update | London Transport | |||
North London Line update | London Transport | |||
East London Line Progress Update | London Transport |