Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]() |
#2
![]() |
|||
|
|||
![]() wrote in message ... said: . improved platform train interface What on earth does this mean in plain English? I can just about guess the other ones, but this has me really puzzled. Do not 'mind the gap' anymore, perhaps? Paul |
#3
![]() |
|||
|
|||
![]()
"Paul Scott" wrote in message
... wrote in message ... said: . improved platform train interface I can just about guess the other ones, but this has me really puzzled. Do not 'mind the gap' anymore, perhaps? I don't think the platforms on the W&C are curved and gappy anyway. I suspect they mean level access ... but since IIRC the Bank platforms can not be reached from the street by a wheelchair anyway, that seems fairly pointless. Then again, it's batter to get this stuff done when the line is shut than to have to shut the line again when a lift is put in. I guess that the NSE stripes on the platforms will be disappearing. -- John Rowland - Spamtrapped Transport Plans for the London Area, updated 2001 http://www.geocities.com/Athens/Acro...69/tpftla.html A man's vehicle is a symbol of his manhood. That's why my vehicle's the Piccadilly Line - It's the size of a county and it comes every two and a half minutes |
#4
![]() |
|||
|
|||
![]()
On Thu, 29 Sep 2005 15:52:53 +0100, "John Rowland"
wrote: Do not 'mind the gap' anymore, perhaps? I don't think the platforms on the W&C are curved and gappy anyway. I suspect they mean level access ... So it's an up-and-down gap then :-) |
#5
![]() |
|||
|
|||
![]()
On Thu, 29 Sep 2005 15:02:44 +0100, wrote:
said: . improved platform train interface What on earth does this mean in plain English? I can just about guess the other ones, but this has me really puzzled. You won't have to Mind The Gap :-) |
#6
![]() |
|||
|
|||
![]()
Laurence Payne said:
On Thu, 29 Sep 2005 15:02:44 +0100, wrote: said: . improved platform train interface What on earth does this mean in plain English? I can just about guess the other ones, but this has me really puzzled. You won't have to Mind The Gap :-) Thanks. |
#7
![]() |
|||
|
|||
![]() Apparently the trains are to be craned out during the closure for modification. |
#8
![]() |
|||
|
|||
![]() wrote in message oups.com... Apparently the trains are to be craned out during the closure for modification. That's the only way they will get out of the drain. ![]() Andrew |
#9
![]() |
|||
|
|||
![]()
In message , Andy
writes Apparently the trains are to be craned out during the closure for modification. That's the only way they will get out of the drain. ![]() Considering all the years the Drain has been running why has a ramp not been built to get trains out to B.R. or since conversion, as it's 92 stock connect it to the nearest tube at Bank or the nearest underground line at waterloo. -- Clive |
#10
![]() |
|||
|
|||
![]() |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Tower Bridge To Close For 3 Months | London Transport | |||
Waterloo & City line crane operation this weekend... | London Transport | |||
Waterloo & City line | London Transport | |||
Waterloo & City Line Car Lift Operation | London Transport | |||
LU to close Waterloo&City line to save money. | London Transport |