London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #13   Report Post  
Old March 16th 07, 10:54 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 3,995
Default North London Line Revisited

On Fri, 16 Mar 2007 19:22:02 +0000, Edward Cowling London UK
wrote:

In message , Paul Scott
writes


I feel there is a real risk that the shiny new trains will attract even more
new passengers than they have space for - its a pity the planned service
frequency increases can't be guaranteed to be delivered at the same time as
the trains...

Ok, my two pennorth on how to improve the NLL.

1. Get the stations manned ! That will give control over the fare
dodgers who seem to think the service is free. It will also give more
control of the huge amount of haulage that goes on. Plus it will get rid
of the impression that no one is in charge of it.


TfL will fix this.

2. Get longer trains now. Not in 5 or 7 years but make it a priority to
get the platforms enlarged and get the 4 carriage trains within the year
and extend to 6 carriages by 2012.


To be fair this is not achieveable in the short timescale you specify.
Whether we like it or not getting new and longer trains into service
takes time for a pile of good reasons even if the public might not like
or understand those reasons.

3. Get all the mile long goods trains to run at night. No exceptions.
During the day it's for carrying Londoners, not bags of cement.


If you were to insist on this then it is likely the cement will go by
lorry and wreck London's streets. I take the point but rail freight
customers do have access rights under the NR regime so they have an
entitlement to daytime paths that is protected under rail regulation.

I would prefer that there was a policy to provide additional track,
siding and signalling capacity to correctly cater for passenger and
freight traffic in the most effective manner to meet both sets of needs.

4. Get the staff trained in how to deal with the public. I see the
problems the Tube got rid of years ago. Not a huge moan about obviously
tired and harassed staff.... they just need training.


I am sure TfL and their concessionaire will do that too.

Ok, that'll do for starters :-)


I expected a longer list.
--
Paul C


Admits to working for London Underground!
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Oyster fares and Shepherd's Bush London Overground ( Revisited ) [email protected] London Transport 13 April 23rd 09 02:32 PM
Camden Town revisited - many times, many,many times Bob London Transport 52 September 4th 07 03:30 PM
North London Line update Paul G London Transport 15 June 17th 06 12:39 AM
Improvements to the North London Line [email protected] London Transport 39 June 22nd 05 09:37 PM
Supermarket transport-oriented film list revisited Tom Anderson London Transport 0 April 13th 05 07:31 PM


All times are GMT. The time now is 08:29 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017