Default Stratford - new DLR platforms


"Stephen Furley" wrote in message
ups.com...
On 8 Jun, 18:02, umpston wrote:

The Great Eastern Railway (later LNER) ran passenger services from
Fenchurch St. to Stratford via Bow Road for many years. The two bay
platforms were intended for this but never used since these trains
were axed in the late 1940s, and Bow Road station closed, before the
Stratford reconstruction was completed.


Stratford is the only station with more than two platforms I can think
of where the lowest (1) and highest (15) numbered platforms are next
to each other.


How about Edinburgh Waverley, where 1 and 20 are together?

Also, it must surely be the only station where four consecutivly
numbered platforms, 2-5, have four different elextrification systems,
at least for a few more days. Of course, it also had two other
systems in the past.

How are the new DLR platforms going to be numbered?


I would suggest 4A and 4B if I was a betting man, as the whole station
needs renumbering, but it would probably make sense to wait until all the
alterations to provide new NLL platforms and the new westbound Central line
platform are completed.

Paul S


  #2   Report Post  
Old June 11th 07, 05:27 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default Stratford - new DLR platforms


"Paul Scott" wrote in message
...

"Stephen Furley" wrote in message
ups.com...


How are the new DLR platforms going to be numbered?


I would suggest 4A and 4B if I was a betting man, as the whole station
needs renumbering, but it would probably make sense to wait until all the
alterations to provide new NLL platforms and the new westbound Central
line platform are completed.


On second thoughts, don't place any bets, the platforms are already shown as
4A and 4B on TfL's drawings of the Stratford upgrades...

Paul


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Stratford Regional-Stratford Intl on DLR Mark Morton London Transport 7 April 8th 10 03:31 PM
Stratford Signage, National Rail -- DLR platforms Tim Fardell London Transport 7 February 23rd 10 02:41 PM
new Stratford London Overground platforms Martin Petrov London Transport 9 April 7th 09 01:49 PM
New platforms at Stratford Martin Petrov London Transport 10 February 7th 09 09:31 PM
Kings Cross Underground - New Platforms lonelytraveller London Transport 2 October 7th 07 08:19 PM


All times are GMT. The time now is 03:00 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017