Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Thanks to Mr Thant's photo on his blog today (4th of 4), I was wondering
about the reasoning behind the Stratford DLR bridge, from platform 5 to new 4A/B. http://londonconnections.blogspot.co...ngs-today.html Clearly they are worried about people piling over the platform edge, hence the barrier, so why didn't the gap in line with the steps and the end of the bay (all of about 20ft?) get filled in, so that pax from and to the bridge would move along the platform, in stead of across it? Paul |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Stratford Regional-Stratford Intl on DLR | London Transport | |||
Stratford to Deptford Bridge | London Transport | |||
Stratford DLR | London Transport | |||
TfL Board gives approval for next step for DLR Stratford extension | London Transport | |||
DLR or Jubilee line extension to Stratford International - two questions | London Transport |