Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On Jan 25, 11:47 am, Andy wrote:
This Saturday there is engineering work which means the the West Ruislip - Marylebone services are diverted to Paddington. Currently Oyster PAYG is valid on the Marylebone route, but not into Paddington (this being on the list for spring 2008). Does anyone know if provision has made for people touching in at West Ruislip and then not being able to touch out at Paddington during the diversion? Will the be posters saying that PAYG is not available or will people have to phone up about unresolved journeys. Last Saturday I took the train from West Hampstead thameslink to St Pancras. Usually PAYG is valid on this route, but because of engineering work the train ran into the high level platforms at St P, where there were no gates and no obvious place to touch out, so I got charged the max cash fare and had to ring the oyster helpline to get it refunded. I don't know what else I could/should have done. |
#2
![]() |
|||
|
|||
![]()
On Jan 26, 9:04*am, brixtonite wrote:
On Jan 25, 11:47 am, Andy wrote: This Saturday there is engineering work which means the the West Ruislip - Marylebone services are diverted to Paddington. Currently Oyster PAYG is valid on the Marylebone route, but not into Paddington (this being on the list for spring 2008). Does anyone know if provision has made for people touching in at West Ruislip and then not being able to touch out at Paddington during the diversion? Will the be posters saying that PAYG is not available or will people have to phone up about unresolved journeys. Last Saturday I took the train from West Hampstead thameslink to St Pancras. *Usually PAYG is valid on this route, but because of engineering work the train ran into the high level platforms at St P, where there were no gates and no obvious place to touch out, so I got charged the max cash fare and had to ring the oyster helpline to get it refunded. *I don't know what else I could/should have done. Did you see if the level platform gates still manned? If so, you could have asked to touch out there. If there are no validators at St. Pancras high level then you should write to (or email) FCC to ask about what they are going to do about it. |
#3
![]() |
|||
|
|||
![]()
On 26 Jan, 09:04, brixtonite wrote:
On Jan 25, 11:47 am, Andy wrote: This Saturday there is engineering work which means the the West Ruislip - Marylebone services are diverted to Paddington. Currently Oyster PAYG is valid on the Marylebone route, but not into Paddington (this being on the list for spring 2008). Does anyone know if provision has made for people touching in at West Ruislip and then not being able to touch out at Paddington during the diversion? Will the be posters saying that PAYG is not available or will people have to phone up about unresolved journeys. Last Saturday I took the train from West Hampstead thameslink to St Pancras. Usually PAYG is valid on this route, but because of engineering work the train ran into the high level platforms at St P, where there were no gates and no obvious place to touch out, so I got charged the max cash fare and had to ring the oyster helpline to get it refunded. I don't know what else I could/should have done. Interesting. I was aware of Thameslink engineering work that meant trains were diverted into St. Pancras high-level, but my cursory glance at the website suggested that it was only the Bedford "expresses", which are first stop St Albans, which wouldn't have been an issue with regards to Oyster Pay-as-you-go. I was evidently wrong. I understand there are going to be many weekend blockades of the central Thameslink route through central London for works associated with the Thameslink Programme (aka Thameslink 2000) - I'm guessing that this will mean that the situation you encountered, with trains being diverted into St. Pancras high-level, will happen lots more in the future. It looks like FCC and TfL need to sort out a solution for this. One or two Oyster readers on the high-level platforms at St. Pancras would suffice. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Planned engineering work between Acton Town and Hammersmith this weekend | London Transport | |||
Planned engineering work between Acton Town and Hammersmith this weekend | London Transport | |||
Engineering work ticket validity | London Transport | |||
Weekend engineering work | London Transport | |||
Tramlink engineering work. | London Transport |