On Jan 25, 11:47 am, Andy wrote:
This Saturday there is engineering work which means the the West
Ruislip - Marylebone services are diverted to Paddington. Currently
Oyster PAYG is valid on the Marylebone route, but not into Paddington
(this being on the list for spring 2008). Does anyone know if
provision has made for people touching in at West Ruislip and then not
being able to touch out at Paddington during the diversion? Will the
be posters saying that PAYG is not available or will people have to
phone up about unresolved journeys.


Last Saturday I took the train from West Hampstead thameslink to St
Pancras. Usually PAYG is valid on this route, but because of
engineering work the train ran into the high level platforms at St P,
where there were no gates and no obvious place to touch out, so I got
charged the max cash fare and had to ring the oyster helpline to get
it refunded. I don't know what else I could/should have done.
  #2   Report Post  
Old January 26th 08, 08:40 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2006
Posts: 498
Default Oyster PAYG and weekend engineering work

On Jan 26, 9:04*am, brixtonite wrote:
On Jan 25, 11:47 am, Andy wrote:

This Saturday there is engineering work which means the the West
Ruislip - Marylebone services are diverted to Paddington. Currently
Oyster PAYG is valid on the Marylebone route, but not into Paddington
(this being on the list for spring 2008). Does anyone know if
provision has made for people touching in at West Ruislip and then not
being able to touch out at Paddington during the diversion? Will the
be posters saying that PAYG is not available or will people have to
phone up about unresolved journeys.


Last Saturday I took the train from West Hampstead thameslink to St
Pancras. *Usually PAYG is valid on this route, but because of
engineering work the train ran into the high level platforms at St P,
where there were no gates and no obvious place to touch out, so I got
charged the max cash fare and had to ring the oyster helpline to get
it refunded. *I don't know what else I could/should have done.


Did you see if the level platform gates still manned? If so, you could
have asked to touch out there. If there are no validators at St.
Pancras high level then you should write to (or email) FCC to ask
about what they are going to do about it.
  #3   Report Post  
Old January 26th 08, 10:24 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default Oyster PAYG and weekend engineering work

On 26 Jan, 09:04, brixtonite wrote:
On Jan 25, 11:47 am, Andy wrote:

This Saturday there is engineering work which means the the West
Ruislip - Marylebone services are diverted to Paddington. Currently
Oyster PAYG is valid on the Marylebone route, but not into Paddington
(this being on the list for spring 2008). Does anyone know if
provision has made for people touching in at West Ruislip and then not
being able to touch out at Paddington during the diversion? Will the
be posters saying that PAYG is not available or will people have to
phone up about unresolved journeys.


Last Saturday I took the train from West Hampstead thameslink to St
Pancras. Usually PAYG is valid on this route, but because of
engineering work the train ran into the high level platforms at St P,
where there were no gates and no obvious place to touch out, so I got
charged the max cash fare and had to ring the oyster helpline to get
it refunded. I don't know what else I could/should have done.



Interesting. I was aware of Thameslink engineering work that meant
trains were diverted into St. Pancras high-level, but my cursory
glance at the website suggested that it was only the Bedford
"expresses", which are first stop St Albans, which wouldn't have been
an issue with regards to Oyster Pay-as-you-go. I was evidently wrong.

I understand there are going to be many weekend blockades of the
central Thameslink route through central London for works associated
with the Thameslink Programme (aka Thameslink 2000) - I'm guessing
that this will mean that the situation you encountered, with trains
being diverted into St. Pancras high-level, will happen lots more in
the future. It looks like FCC and TfL need to sort out a solution for
this. One or two Oyster readers on the high-level platforms at St.
Pancras would suffice.
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Planned engineering work between Acton Town and Hammersmith this weekend [email protected] London Transport 48 January 11th 13 10:38 PM
Planned engineering work between Acton Town and Hammersmith this weekend [email protected] London Transport 0 January 6th 13 08:17 PM
Engineering work ticket validity Dave Arquati London Transport 0 February 22nd 05 04:10 PM
Weekend engineering work Lawrence Myers London Transport 2 November 25th 04 06:43 PM
Tramlink engineering work. Clive R Robertson London Transport 0 August 9th 04 09:24 AM


All times are GMT. The time now is 06:58 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017