London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #5   Report Post  
Old June 4th 08, 03:07 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default Blackfriars - SET services after December 2008


On 4 Jun, 10:56, Mr Thant
wrote:

On 4 Jun, 10:12, wrote:

I wonder if theres an argument for extending the 3rd rail to kentish
town so dual voltage stock isn't required.


Apart from any other reasons, this would be pretty costly, and require
the installation of a whole new array of kit and more substations.


It wouldn't be very useful. The interim arrangement is more about
having somewhere to send the peak services from the north with the
Moorgate branch gone. There's not really anywhere to terminate them,
so running them through as services to Kent (replacing the SET
Blackfriars services) is the only real option.


But that only accounts for the displaced peak (no-longer Moorgate
bound) Thameslink trains from points north.

I presume terminating the other off-peak trains at City Thameslink and
then perhaps parking them up in the Smithfield sidings until they're
due to head south again is considered impractical given the frequency
of trains on the core Thameslink route. At Kentish Town I presume the
benefit is that the fast Bedford trains will be on the fast tracks,
hence there's less opportunity for terminating/reversing trains to jam
up the whole Thameslink service. Still, I can see plenty of
opportunities for things to go snafu if trains are running late.


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
6 Thameslink services to avoid after March 2009 Sky Rider London Transport 0 October 31st 08 04:53 PM
Withdrawal of Off Peak Inter-City services from Watford Junction to North West - Dec 2008 burkey London Transport 0 February 24th 07 12:35 AM
SET 376 - A big disappointment Rich Mallard London Transport 36 February 24th 05 12:41 PM
376 diagrams on SET website Rupert Candy London Transport 0 October 15th 04 10:16 AM
LUL set to close Met line daveb London Transport 19 February 16th 04 04:15 PM


All times are GMT. The time now is 12:55 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017