On Dec 2, 3:39*pm, Tom Anderson wrote:
My gut feeling is that adding a third bore to a two-bore setup is a lot
more expensive than adding a footbridge to a railway bridge. In fact, i
can't see how there being two bores there already makes the third any
cheaper, so it would be as expensive as building it as a standalone.


The DLR Woolwich Arsenal twin tunnels were built by sending one boring
machine from King George V to Woolwich, turning it round, and sending
it back again. So in theory you could give it another twirl (probably
works OK time-wise too, as fitting out a rail tunnel takes a lot
longer than fitting out a foot/cycle tunnel) for at least *some* cost
savings.

--
John Band
john at johnband dot org
www.johnband.org

  #12   Report Post  
Old December 2nd 08, 04:33 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2003
Posts: 3,188
Default A foot and cycle bridge across Barking Creek as part of the DLRDagenham Dock extension?

On Tue, 2 Dec 2008, John B wrote:

On Dec 2, 3:39*pm, Tom Anderson wrote:
My gut feeling is that adding a third bore to a two-bore setup is a lot
more expensive than adding a footbridge to a railway bridge. In fact, i
can't see how there being two bores there already makes the third any
cheaper, so it would be as expensive as building it as a standalone.


The DLR Woolwich Arsenal twin tunnels were built by sending one boring
machine from King George V to Woolwich, turning it round, and sending it
back again. So in theory you could give it another twirl (probably works
OK time-wise too, as fitting out a rail tunnel takes a lot longer than
fitting out a foot/cycle tunnel) for at least *some* cost savings.


Yebbut then you've got to pack it up at the far end, rather than at the
near end, where it started, and where you thus already have all the gear
and access. Logically, you should bore a *fourth* tunnel, to minimise
costs.

tom

--
I could tell you a great many more particulars but suppose that you are
tired of it by this time. -- John Backhouse, Trainspotter Zero
  #13   Report Post  
Old December 2nd 08, 04:50 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default A foot and cycle bridge across Barking Creek as part of the DLR Dagenham Dock extension?


"Tom Anderson" wrote in message
h.li...
On Tue, 2 Dec 2008, John B wrote:

On Dec 2, 3:39 pm, Tom Anderson wrote:
My gut feeling is that adding a third bore to a two-bore setup is a lot
more expensive than adding a footbridge to a railway bridge. In fact, i
can't see how there being two bores there already makes the third any
cheaper, so it would be as expensive as building it as a standalone.


The DLR Woolwich Arsenal twin tunnels were built by sending one boring
machine from King George V to Woolwich, turning it round, and sending it
back again. So in theory you could give it another twirl (probably works
OK time-wise too, as fitting out a rail tunnel takes a lot longer than
fitting out a foot/cycle tunnel) for at least *some* cost savings.


Yebbut then you've got to pack it up at the far end, rather than at the
near end, where it started, and where you thus already have all the gear
and access. Logically, you should bore a *fourth* tunnel, to minimise
costs.


You'd have to bore a fourth tunnel, to separate the cyclists and the
pedestrians.

c.f. the various Tyne tunnels, where they are just completing the fourth
(sunken prefabricated) tunnel, having done everything in the wrong order
over the years... :-)

Paul S


  #14   Report Post  
Old December 2nd 08, 05:04 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2003
Posts: 3,188
Default A foot and cycle bridge across Barking Creek as part of the DLRDagenham Dock extension?

On Tue, 2 Dec 2008, Paul Scott wrote:

"Tom Anderson" wrote in message
h.li...
On Tue, 2 Dec 2008, John B wrote:

On Dec 2, 3:39 pm, Tom Anderson wrote:
My gut feeling is that adding a third bore to a two-bore setup is a lot
more expensive than adding a footbridge to a railway bridge. In fact, i
can't see how there being two bores there already makes the third any
cheaper, so it would be as expensive as building it as a standalone.

The DLR Woolwich Arsenal twin tunnels were built by sending one boring
machine from King George V to Woolwich, turning it round, and sending it
back again. So in theory you could give it another twirl (probably works
OK time-wise too, as fitting out a rail tunnel takes a lot longer than
fitting out a foot/cycle tunnel) for at least *some* cost savings.


Yebbut then you've got to pack it up at the far end, rather than at the
near end, where it started, and where you thus already have all the gear
and access. Logically, you should bore a *fourth* tunnel, to minimise
costs.


You'd have to bore a fourth tunnel, to separate the cyclists and the
pedestrians.


No, you need a cycle tunnel in each direction. Rubber rings for
pedestrians.

tom

--
I could tell you a great many more particulars but suppose that you are
tired of it by this time. -- John Backhouse, Trainspotter Zero
  #15   Report Post  
Old December 3rd 08, 03:09 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 2,577
Default A foot and cycle bridge across Barking Creek as part of the DLR Dagenham Dock extension?

Tom Anderson wrote:
On Tue, 2 Dec 2008, John Rowland wrote:

How about a hand-wound transporter bridge hanging from the fixed bar
of the flood barrier?


APPROVED. Possibly even pedal-powered!

I want one on Dartford Creek too.


There seems to be no fixed bar in the flood barrier there, so it would be
more expensive. And I don't think there are any ships there either, making
it a bit pointless. I don't think a hand-wound chain ferry like the one on
Trowbridge Island, Kingston would work well on a tidal creek. So a standard
bridge would probably be cheaper.




  #16   Report Post  
Old December 4th 08, 11:47 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2003
Posts: 63
Default A foot and cycle bridge across Barking Creek as part of the DLRDagenham Dock extension?

John Rowland wrote:
Tom Anderson wrote:
On Tue, 2 Dec 2008, John Rowland wrote:
How about a hand-wound transporter bridge hanging from the fixed bar
of the flood barrier?

APPROVED. Possibly even pedal-powered!

I want one on Dartford Creek too.


There seems to be no fixed bar in the flood barrier there, so it would be
more expensive. And I don't think there are any ships there either, making
it a bit pointless. I don't think a hand-wound chain ferry like the one on
Trowbridge Island, Kingston would work well on a tidal creek. So a standard
bridge would probably be cheaper.


I've often thought that a simple 'transporter bridge' for foot and bikes
could be built using standard components from a tower crane. With modern
electronics (including secure wireless) the contols and interlocks would
be a piece of cake. You don't need it hand wound as a few small wind
turbines, with a few batteries would easily provide the power and would
give less things for people to fiddle with.

I'd suggested a similar arrangement to cross a 'navigable' river
elsewhere, because approach ramps for a fixed span above navigation
level would require expensive long approach spans (an embankment would
not be permitted as it would obstructe flood flows)

Jim Chisholm
  #17   Report Post  
Old December 5th 08, 05:52 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2007
Posts: 45
Default A foot and cycle bridge across Barking Creek as part of the DLR Dagenham Dock extension?

"John Rowland" wrote in message
...
Tom Anderson wrote:
On Tue, 2 Dec 2008, John Rowland wrote:

How about a hand-wound transporter bridge hanging from the fixed bar
of the flood barrier?


APPROVED. Possibly even pedal-powered!

I want one on Dartford Creek too.


There seems to be no fixed bar in the flood barrier there, so it would be
more expensive. And I don't think there are any ships there either, making
it a bit pointless. I don't think a hand-wound chain ferry like the one on
Trowbridge Island, Kingston would work well on a tidal creek. So a
standard bridge would probably be cheaper.


ITYM Trowlock Island, Teddington
--
David Biddulph




Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Yet another new foot/cycle Thames bridge planned Recliner[_2_] London Transport 8 November 16th 12 07:09 AM
Dagenham Dock and Gateway Bridge Paul Scott London Transport 10 November 28th 08 08:53 AM
[OT] Can you walk across the flood barrier on Dartford Creek? Tom Anderson London Transport 5 May 12th 08 06:04 PM
Huge Tunnel across Chiltern Line at Gerrards Cross redtube London Transport 3 January 5th 05 10:44 AM


All times are GMT. The time now is 09:18 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017