Had a view of the District Line track replacement works between Barking and
Upminster yeaterday, from a passing c2c service. I was wondering what short
of length they can do in a weekend, and if the renewed track is basically
done to the same standards as NR use, eg sleeper spacing, ballast depth etc.
I noticed the same orange tubing guarding cables in the four foot for
instance.

If suitable locos were available, could the 'slinger train' work in the SSL
tunnels at all?

Paul S




  #2   Report Post  
Old December 14th 08, 05:11 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 2,796
Default District - track renewals

On Sun, 14 Dec 2008 16:58:33 -0000, "Paul Scott"
wrote:

Had a view of the District Line track replacement works between Barking and
Upminster yeaterday, from a passing c2c service. I was wondering what short
of length they can do in a weekend, and if the renewed track is basically
done to the same standards as NR use, eg sleeper spacing, ballast depth etc.
I noticed the same orange tubing guarding cables in the four foot for
instance.


Not sure, but I noticed new track on the Met at Euston Square last
week, and was astonished to note that it was of the jointed, bullhead
variety.

When are LUL going to enter the 21st century and move to CWR like the
mainline did years ago?

Neil

--
Neil Williams
Put my first name before the at to reply.
  #3   Report Post  
Old December 14th 08, 06:38 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default District - track renewals


"Neil Williams" wrote in message
...
On Sun, 14 Dec 2008 16:58:33 -0000, "Paul Scott"
wrote:

Had a view of the District Line track replacement works between Barking
and
Upminster yeaterday, from a passing c2c service. I was wondering what
short
of length they can do in a weekend, and if the renewed track is basically
done to the same standards as NR use, eg sleeper spacing, ballast depth
etc.
I noticed the same orange tubing guarding cables in the four foot for
instance.


Not sure, but I noticed new track on the Met at Euston Square last
week, and was astonished to note that it was of the jointed, bullhead
variety.

When are LUL going to enter the 21st century and move to CWR like the
mainline did years ago?


They will have to replace bullhead like for like until the sleepers & chairs
are replaced surely, and the sleepers can last a lot longer in the SSL
tunnels?

The renewals train I saw did seem to be placing CWR though, as I suggested
originally the previously completed sections are practically
indistinguishable from NR recent work (apart from the fourth rail!).

Paul


  #4   Report Post  
Old December 15th 08, 05:49 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Apr 2008
Posts: 194
Default District - track renewals

On Dec 14, 10:11*am, (Neil Williams)
wrote:
On Sun, 14 Dec 2008 16:58:33 -0000, "Paul Scott"

wrote:
Had a view of the District Line track replacement works between Barking and
Upminster yeaterday, from a passing c2c service. I was wondering what short
of length they can do in a weekend, and if the renewed track is basically
done to the same standards as NR use, eg sleeper spacing, ballast depth etc.
I noticed the same orange tubing guarding cables in the four foot for
instance.


Not sure, but I noticed new track on the Met at Euston Square last
week, and was astonished to note that it was of the jointed, bullhead
variety.

When are LUL going to enter the 21st century and move to CWR like the
mainline did years ago?

Neil

Within the confines of tube and sub-surface tunnels one would think
jointed track easier to work with than CWR.

  #5   Report Post  
Old December 15th 08, 10:06 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Sep 2004
Posts: 724
Default District - track renewals

On Mon, 15 Dec 2008 10:49:13 -0800 (PST), 1506
wrote:

On Dec 14, 10:11*am, (Neil Williams)
wrote:
On Sun, 14 Dec 2008 16:58:33 -0000, "Paul Scott"

wrote:
Had a view of the District Line track replacement works between Barking and
Upminster yeaterday, from a passing c2c service. I was wondering what short
of length they can do in a weekend, and if the renewed track is basically
done to the same standards as NR use, eg sleeper spacing, ballast depth etc.
I noticed the same orange tubing guarding cables in the four foot for
instance.


Not sure, but I noticed new track on the Met at Euston Square last
week, and was astonished to note that it was of the jointed, bullhead
variety.

When are LUL going to enter the 21st century and move to CWR like the
mainline did years ago?

Neil

Within the confines of tube and sub-surface tunnels one would think
jointed track easier to work with than CWR.

That IMU is the main reason for its continued use, IIRC there often
isn't sufficient clearance to allow use of the necessary equipment for
laying and fettling CWR and some of the curves would also invite
trouble. I've got an old programme for an open day at Neasden in
196mumble which features a CWR train so it isn't something LU have yet
to discover.


  #6   Report Post  
Old December 15th 08, 11:06 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Apr 2008
Posts: 194
Default District - track renewals

On Dec 15, 3:06*pm, Charles Ellson wrote:
On Mon, 15 Dec 2008 10:49:13 -0800 (PST), 1506





wrote:
On Dec 14, 10:11*am, (Neil Williams)
wrote:
On Sun, 14 Dec 2008 16:58:33 -0000, "Paul Scott"


wrote:
Had a view of the District Line track replacement works between Barking and
Upminster yeaterday, from a passing c2c service. I was wondering what short
of length they can do in a weekend, and if the renewed track is basically
done to the same standards as NR use, eg sleeper spacing, ballast depth etc.
I noticed the same orange tubing guarding cables in the four foot for
instance.


Not sure, but I noticed new track on the Met at Euston Square last
week, and was astonished to note that it was of the jointed, bullhead
variety.


When are LUL going to enter the 21st century and move to CWR like the
mainline did years ago?


Neil


Within the confines of tube and sub-surface tunnels one would think
jointed track easier to work with than CWR.


That IMU is the main reason for its continued use, IIRC there often
isn't sufficient clearance to allow use of the necessary equipment for
laying and fettling CWR and some of the curves would also invite
trouble. I've got an old programme for an open day at Neasden in
196mumble which features a CWR train so it isn't something LU have yet
to discover.


Quite, I am sure CWR could be used to good effect on the surface
section to Amersham, horses for courses.

  #7   Report Post  
Old December 15th 08, 11:36 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Mar 2005
Posts: 41
Default District - track renewals

On Mon, 15 Dec 2008 16:06:54 -0800 (PST), 1506
wrote:

On Dec 15, 3:06*pm, Charles Ellson wrote:
On Mon, 15 Dec 2008 10:49:13 -0800 (PST), 1506

wrote:
On Dec 14, 10:11*am, (Neil Williams)
wrote:
On Sun, 14 Dec 2008 16:58:33 -0000, "Paul Scott"


wrote:
Had a view of the District Line track replacement works between Barking and
Upminster yeaterday, from a passing c2c service. I was wondering what short
of length they can do in a weekend, and if the renewed track is basically
done to the same standards as NR use, eg sleeper spacing, ballast depth etc.
I noticed the same orange tubing guarding cables in the four foot for
instance.


Not sure, but I noticed new track on the Met at Euston Square last
week, and was astonished to note that it was of the jointed, bullhead
variety.


When are LUL going to enter the 21st century and move to CWR like the
mainline did years ago?


Neil


Within the confines of tube and sub-surface tunnels one would think
jointed track easier to work with than CWR.


That IMU is the main reason for its continued use, IIRC there often
isn't sufficient clearance to allow use of the necessary equipment for
laying and fettling CWR and some of the curves would also invite
trouble. I've got an old programme for an open day at Neasden in
196mumble which features a CWR train so it isn't something LU have yet
to discover.


Quite, I am sure CWR could be used to good effect on the surface
section to Amersham, horses for courses.


They had CWR long before it took off on BR.

Because it was so new and nobody knew how to handle expansion, they
used what are best described as being like point blades sliding
against each other.
  #8   Report Post  
Old December 16th 08, 09:15 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default District - track renewals

In article ,
(Christopher A. Lee) wrote:

On Mon, 15 Dec 2008 16:06:54 -0800 (PST), 1506
wrote:

On Dec 15, 3:06*pm, Charles Ellson wrote:
On Mon, 15 Dec 2008 10:49:13 -0800 (PST), 1506

wrote:
On Dec 14, 10:11*am, (Neil Williams)
wrote:
On Sun, 14 Dec 2008 16:58:33 -0000, "Paul Scott"

wrote:
Had a view of the District Line track replacement works between
Barking and Upminster yeaterday, from a passing c2c service. I
was wondering what short of length they can do in a weekend,
and if the renewed track is basically done to the same
standards as NR use, eg sleeper spacing, ballast depth etc.
I noticed the same orange tubing guarding cables in the four
foot for instance.

Not sure, but I noticed new track on the Met at Euston Square last
week, and was astonished to note that it was of the jointed,
bullhead variety.

When are LUL going to enter the 21st century and move to CWR like
the mainline did years ago?

Within the confines of tube and sub-surface tunnels one would think
jointed track easier to work with than CWR.

That IMU is the main reason for its continued use, IIRC there often
isn't sufficient clearance to allow use of the necessary equipment
for laying and fettling CWR and some of the curves would also invite
trouble. I've got an old programme for an open day at Neasden in
196mumble which features a CWR train so it isn't something LU have
yet to discover.


Quite, I am sure CWR could be used to good effect on the surface
section to Amersham, horses for courses.


They had CWR long before it took off on BR.

Because it was so new and nobody knew how to handle expansion, they
used what are best described as being like point blades sliding
against each other.


BR/NR use(d) them too.

--
Colin Rosenstiel
  #9   Report Post  
Old December 16th 08, 09:27 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jan 2007
Posts: 3
Default District - track renewals

On Dec 14, 10:11=A0am, (Neil Williams)
wrote:

Not sure, but I noticed new track on the Met at Euston Square last
week, and was astonished to note that it was of the jointed, bullhead
variety.


When are LUL going to enter the 21st century and move to CWR like the
mainline did years ago?


There are two separate and distinct questions he

1. Fishplated v. welded rail: as others have remarked the Underground
has been using welded rails for many, many years. However, the Civil
Engineers always used to complain that the long rails they laid were
then cut into shorter lengths again by the Signal Engineers for
blockjoints. Because of the intense service traditional L.T.
signalling has many more signals per mile, and hence many more track
circuits, than most Network Rail lines.

2. Bullhead v. flat-bottomed rail: Flat-bottomed rail is now being
installed, even in tube tunnels, but this is comparatively recent.
Previously, the B.R. form of flat-bottomed rail installation gave a
greater sleeper-to-railhead distance than bullhead by an amount that
was significant in the close confines of a tube tunnel. There were
also questions about the having to redesign switch and crossing work
for flat-bottomed rail. I'm not sufficiently in touch to know the
details of how these problems were solved.

Cheers,
John
  #10   Report Post  
Old December 16th 08, 10:31 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Apr 2008
Posts: 194
Default District - track renewals

On Dec 16, 2:27*pm, (John S.Robinson) wrote:
On Dec 14, 10:11=A0am, (Neil Williams)
wrote:

Not sure, but I noticed new track on the Met at Euston Square last
week, and was astonished to note that it was of the jointed, bullhead
variety.
When are LUL going to enter the 21st century and move to CWR like the
mainline did years ago?


There are two separate and distinct questions he

1. Fishplated v. welded rail: as others have remarked the Underground
has been using welded rails for many, many years. However, the Civil
Engineers always used to complain that the long rails they laid were
then cut into shorter lengths again by the Signal Engineers for
blockjoints. Because of the intense service traditional L.T.
signalling has many more signals per mile, and hence many more track
circuits, than most Network Rail lines.

2. Bullhead v. flat-bottomed rail: Flat-bottomed rail is now being
installed, even in tube tunnels, but this is comparatively recent.
Previously, the B.R. form of flat-bottomed rail installation gave a
greater sleeper-to-railhead distance than bullhead by an amount that
was significant in the close confines of a tube tunnel. There were
also questions about the having to redesign switch and crossing work
for flat-bottomed rail. I'm not sufficiently in touch to know the
details of how these problems were solved.

Thank you. That is very informative. I wonder if slab track would be
a good solution for the Circle Line. It is used on Thameslink.


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Freedom Pass Renewals CJB London Transport 17 February 14th 15 10:05 AM
Track Charts or Track maps of the London Underground [email protected] London Transport 5 December 16th 06 01:30 AM
London Underground track Smokeyone London Transport 12 December 9th 03 05:54 AM
Bakerloo southbound track problem? Andrew P Smith London Transport 3 November 6th 03 09:12 PM
Success of Central Line Closure answer to Track Maintenance CJG London Transport 11 August 7th 03 09:11 PM


All times are GMT. The time now is 09:21 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017