Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Had a view of the District Line track replacement works between Barking and
Upminster yeaterday, from a passing c2c service. I was wondering what short of length they can do in a weekend, and if the renewed track is basically done to the same standards as NR use, eg sleeper spacing, ballast depth etc. I noticed the same orange tubing guarding cables in the four foot for instance. If suitable locos were available, could the 'slinger train' work in the SSL tunnels at all? Paul S |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Freedom Pass Renewals | London Transport | |||
Track Charts or Track maps of the London Underground | London Transport | |||
London Underground track | London Transport | |||
Bakerloo southbound track problem? | London Transport | |||
Success of Central Line Closure answer to Track Maintenance | London Transport |