I had a look around Shoreditch last night and all of the ramps and
viaducts joining the original ELL to the Broad Street Viaduct are now
done, bar the very last arch over New Inn Yard. But even that has
rebar and most of its formers in place and is just waiting for its
concrete to be poured. But once it is, you'll be able to walk all the
way from New Cross Gate to Dalston Junction without having to leap any
gaps or crawl over scaffolding.

Looks like the projected late 2009 opening date (six months early)
might actually happen.

U

  #2   Report Post  
Old December 30th 08, 05:58 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default East London Line extension - contiguous trackbed ahoy


"Mr Thant" wrote in message
...
I had a look around Shoreditch last night and all of the ramps and
viaducts joining the original ELL to the Broad Street Viaduct are now
done, bar the very last arch over New Inn Yard. But even that has
rebar and most of its formers in place and is just waiting for its
concrete to be poured. But once it is, you'll be able to walk all the
way from New Cross Gate to Dalston Junction without having to leap any
gaps or crawl over scaffolding.

Looks like the projected late 2009 opening date (six months early)
might actually happen.


I wonder if the rolling stock delivery will turn out to be the obstacle
to early opening, rather than the infrastructure?

OTOH, could the infrastructure and rolling stock be ready, but awaiting the
NR timetable change needed for the Sydenham corridor stopping services,
presumably planned for May 2010?

Paul S



  #3   Report Post  
Old December 30th 08, 08:23 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Apr 2008
Posts: 194
Default East London Line extension - contiguous trackbed ahoy

On Dec 30, 10:35*am, Mr Thant
wrote:
I had a look around Shoreditch last night and all of the ramps and
viaducts joining the original ELL to the Broad Street Viaduct are now
done, bar the very last arch over New Inn Yard. But even that has
rebar and most of its formers in place and is just waiting for its
concrete to be poured. But once it is, you'll be able to walk all the
way from New Cross Gate to Dalston Junction without having to leap any
gaps or crawl over scaffolding.

Looks like the projected late 2009 opening date (six months early)
might actually happen.

WONDERFUL NEWS!

Thank you for posting U.


  #4   Report Post  
Old December 31st 08, 09:16 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2008
Posts: 1
Default East London Line extension - contiguous trackbed ahoy

Mr Thant wrote:
I had a look around Shoreditch last night and all of the ramps and
viaducts joining the original ELL to the Broad Street Viaduct are now
done, bar the very last arch over New Inn Yard. But even that has
rebar and most of its formers in place and is just waiting for its
concrete to be poured. But once it is, you'll be able to walk all the
way from New Cross Gate to Dalston Junction without having to leap any
gaps or crawl over scaffolding.

Looks like the projected late 2009 opening date (six months early)
might actually happen.


I must say I have been amazed at the progress at the New Cross Gate end,
but when I was up at Spitalfields Farm about a month ago there were a
couple senior engineers from the project visiting and I posed the early
opening idea to them, but they were adamant that it would be summer 2010
regardless...
But who can tell?

--
Martin

replies to newsgroup only please.
  #5   Report Post  
Old December 31st 08, 09:41 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2003
Posts: 459
Default East London Line extension - contiguous trackbed ahoy

On Dec 30, 6:58*pm, "Paul Scott"
wrote:
OTOH, could the infrastructure and rolling stock be ready, but awaiting the
NR timetable change needed for the Sydenham corridor stopping services,
presumably planned for May 2010?


Couldn't they just run to new cross and back in the meantime?

B2003



  #6   Report Post  
Old December 31st 08, 11:32 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2003
Posts: 3,188
Default East London Line extension - contiguous trackbed ahoy

On Tue, 30 Dec 2008, Mr Thant wrote:

I had a look around Shoreditch last night and all of the ramps and
viaducts joining the original ELL to the Broad Street Viaduct are now
done, bar the very last arch over New Inn Yard. But even that has rebar
and most of its formers in place and is just waiting for its concrete to
be poured. But once it is, you'll be able to walk all the way from New
Cross Gate to Dalston Junction without having to leap any gaps or crawl
over scaffolding.


Although if anyone spots you, it might be wiser to run!

tom

--
secular utopianism is based on a belief in an unstoppable human ability
to make a better world -- Rt Rev Tom Wright
  #7   Report Post  
Old December 31st 08, 04:19 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default East London Line extension - contiguous trackbed ahoy


wrote in message
...
On Dec 30, 6:58 pm, "Paul Scott"
wrote:
OTOH, could the infrastructure and rolling stock be ready, but awaiting
the
NR timetable change needed for the Sydenham corridor stopping services,
presumably planned for May 2010?


Couldn't they just run to new cross and back in the meantime?


Yes, or even NXG, as the down line runs into the former terminating
platform. I wonder if there'll be paths for a limited service to Crystal
Palace and/or West Croydon anyway, I expect it's the full 8 tph LO service
down that way that requires the major changes to Southern's existing
timetable.

Paul S


  #8   Report Post  
Old January 5th 09, 12:41 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2008
Posts: 288
Default East London Line extension - contiguous trackbed ahoy

"Paul Scott" wrote ...
I wonder if the rolling stock delivery will turn out to be the obstacle
to early opening, rather than the infrastructure?
OTOH, could the infrastructure and rolling stock be ready, but awaiting
the NR timetable change needed for the Sydenham corridor stopping
services, presumably planned for May 2010?


Right first time - the stock is already subject to delay (citing 'problems
with suppliers'), and may - or may not - be further delayed to save a little
cash, especially if the pressure from the planned recipients of 313 units
diminishes with the credit crunch (dread term!).

Either way, a signficantly early start is unlikely, if only because new
building around the tracks will almost certainly NOT finish early, unless
property prices recover smartish.

While 'bits' may be ahead of schedule, that will be unlikely to influence
the project as a whole.
--

Andrew


  #9   Report Post  
Old January 5th 09, 05:45 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2006
Posts: 942
Default East London Line extension - contiguous trackbed ahoy

Andrew Heenan wrote:
Either way, a signficantly early start is unlikely, if only because new
building around the tracks will almost certainly NOT finish early, unless
property prices recover smartish.


Eh? The ELLx isn't being funded by property development, so whether
developers of flats in the surrounding areas have cancelled them or
not is of complete irrelevance to when the railway can be opened. And
it's not a DLR Dagenham Dock type project that requires the new
property to be built in order to have any demand for the service,
either.

--
John Band
john at johnband dot org
www.johnband.org
  #10   Report Post  
Old January 5th 09, 09:43 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2006
Posts: 498
Default East London Line extension - contiguous trackbed ahoy

On Jan 5, 1:41*am, "Andrew Heenan" wrote:
"Paul Scott" wrote ...

I wonder if the rolling stock delivery will turn out to be the obstacle
to early opening, rather than the infrastructure?
OTOH, could the infrastructure and rolling stock be ready, but awaiting
the NR timetable change needed for the Sydenham corridor stopping
services, presumably planned for May 2010?


Right first time - the stock is already subject to delay (citing 'problems
with suppliers'), and may - or may not - be further delayed to save a little
cash, especially if the pressure from the planned recipients of 313 units
diminishes with the credit crunch (dread term!).


Less demand for the class 313 units is more likely to lead to units
for an early reopening. The plan is for the first, 3 car dual voltage
378s to replace the 508 and 313s, these would be followed by the 4 car
DC only 378 units for the East London Line Extension and finally by
the addition of a fourth coach to the initial dual voltage units plus
some 4 car extra units. If 313s can be retained due to lower demands
from FCC, then the early, dual voltage 378s could be released to the
ELLX for any possible early start. I'd be surprised if there was any
planned delays to delivery, other than due to supplier problems. The
finance company would probably not be too happy to have the cash
around to pay for the units, but be told that London Overgrond don't
want them for 6 months.

The first 378 has been at Willesden since before Christmas, although
I've yet to see it out and about. It has, however, undergone testing
on both AC and DC, before arrival.


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Old trackbed next to central line Boltar London Transport 19 February 19th 08 11:49 AM
The East London Line is dead... Long live the East London Line Mizter T London Transport 45 December 24th 07 04:00 PM
East London Line Extension [email protected] London Transport 11 February 19th 06 09:49 PM
East London Line extension news Alan \(in Brussels\) London Transport 49 December 8th 04 09:30 AM
East London Line Extension (Who's gonna control it?) Christine London Transport 19 September 10th 04 12:07 AM


All times are GMT. The time now is 11:19 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017