London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #10   Report Post  
Old April 3rd 09, 01:43 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2007
Posts: 973
Default St Pancras Low Level

On 3 Apr, 14:23, wrote:
Cutbacks to which programme, Thameslink? Is that really likely? Surely
now that the tunnels are built, the connection to ECML isn't that
extensive?


Yes, but they're only useful if the very expensive works to open up
capacity through London Bridge and Bermondsey go ahead. There's a
reasonable argument not to go ahead with this whole phase of works
once the current phase (12 cars at Farringdon and Blackfriars) is
done.

I did wonder how well the flat junction onto the ECML would work
though.


Holloway flyover plus all the bi-directional signalling in the area
means you have a lot of flexibility to avoid conflicts.

U


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Delays expected as work on level crossing begins burkey London Transport 2 March 4th 05 04:58 PM
Putting roof-level railways underground? Michael Bell London Transport 17 December 30th 04 05:38 PM
London's busiest level crossing? [email protected] London Transport 37 December 18th 04 10:36 PM
Level Crossings on busy lines Richard J. London Transport 15 April 26th 04 01:57 PM
level crosings on the LUL IanB London Transport 52 December 22nd 03 04:46 PM


All times are GMT. The time now is 05:16 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017