London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #13   Report Post  
Old October 19th 09, 06:13 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2007
Posts: 264
Default Actual bendy bus capacity?

Tim Roll-Pickering wrote:
Yesterday I had to get the 25 for a joyful journey and I noticed that the
official capacity listed at the front of the bus is 49 sitting, 149 total
(or 142 with a wheelchair). But that wasn't remotely the capacity level beig
followed by the bus driver when not stopping at a number of stops that had a
handful, no more, waiting at them. By my reckoning (from the front) there
were about 30-40 people standing. Even if it was 50 that's still 1/3 of the
official capacity (which would never have all fitted in) not being used.

Is this just a case of poorly trained bus drivers or have the bendies been
given an absurdly high official capacity that can never be achieved? Or is
there some other reason?



Usable capacities used by TfL for modelling the debendifications are 85
(double decker), 70 (single decker) and 120 (bendy). The placarded
capacities are similarly excessive for the new 521/507 non-bendies,
which from me counting people onto them leave Waterloo with about 60 on
board, despite having a placarded capacity somewhat higher. It's
assumed the maximum feasible load is somewhat lower, not least because
with a bus along every couple of minutes the choice of the person at the
front of the queue is a minute or two waiting followed by a seat, or
getting on now and standing.

If memory serves the first bendy routes tried using 149 as the modelling
figure but were rapidly proved not to work with this, and went down to
100. 120 is presumably an enhancement of that in the light of seven
years experience.

Tom
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Harlington's Fate is Sealed - Third Runway only achieves 45% required capacity CJB London Transport 8 August 15th 07 04:53 PM
Tramlink needs Bustitution to meet capacity requirements - crazy Bob London Transport 6 March 9th 07 06:23 PM
DLR Capacity Enhancement Phase 2: North & East Routes Dockland London Transport 4 March 21st 06 04:24 PM
LURS meeting tonight: Docklands Light Railway Capacity Enhancement John Rowland London Transport 0 November 8th 05 01:07 AM
How bendy is a bendy bus? Dave Arquati London Transport 25 November 7th 05 06:47 PM


All times are GMT. The time now is 07:09 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017