London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #16   Report Post  
Old January 30th 10, 07:31 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default Long DLR Train


On Jan 30, 7:39*pm, MIG wrote:

On 30 Jan, 18:30, Paul Terry wrote:

In message , Basil Jet
writes


I suppose what I'm really asking is whether the heavy rail standard still
has any virtues.


I think a DLR set might struggle trying to reach 140mph on a run down to
Ashford. *


As would the majority of heavy rail I should think. *But is it more to
do with what else might hit you on the line?


Freight trains on the mainline versus forgotten tools on the DLR?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Long DLR Trains to Stratford MIG London Transport 10 December 13th 10 06:50 PM
Long DLR Train Part 2 MIG London Transport 1 August 7th 10 12:42 PM
Subway (New York) vs Underground (London) [Quite long] Gareth Davis London Transport 70 April 11th 04 07:39 PM
"How long are the delays?" Kippo Oppik London Transport 3 February 5th 04 10:17 AM
Long-lasting ticket to Brighton Alp140671 London Transport 2 July 28th 03 05:19 PM


All times are GMT. The time now is 03:36 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017