London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old January 17th 11, 07:46 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2009
Posts: 175
Default DLR Extension To Stratford International

Does anyone know when this is scheduled to open?

The Tfl website says "early 2011" which could mean anything between
now and Easter. I thought it was originally meant to open last year,
so presumably there are some delaying factors. If so, what is causing
the delays?

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
DLR Stratford International Roland Perry London Transport 8 July 20th 10 09:34 PM
DLR - Stratford International construction contract Paul Scott London Transport 3 July 3rd 07 05:40 PM
Work to start on DLR from Canning Town to Stratford International John Rowland London Transport 31 January 21st 07 01:37 PM
NLL Closure / DLR to Stratford International Paul Corfield London Transport 32 November 25th 06 12:05 AM
DLR or Jubilee line extension to Stratford International - two questions Bob Robinson London Transport 7 May 4th 04 10:43 PM


All times are GMT. The time now is 02:19 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017