Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Just came across this on BBC News
http://www.bbc.co.uk/news/uk-england-london-15422882 Can't help thinking that Tfl are being a bit optimistic if they think that only 20% of trains will be manually operated by 2017 and all lines will have fully remote train operations by 2020. Would that not require completely new trains track and signalling on the affected lines? The only "fully remote" metro I have used is the VAL system in Lille, and the trains there are far too small to be able to cope with the crowds in London. "Fully remote" operation would require platform edge doors at every station, and I would be very surprised if that could be achieved in 9 years, given current budget constraints. Ticket office closures, reductions in hours and job losses are more likely though (I would have thought) However given TfL's recent experience with the unions, this is more likely to happen gradually over a number of years rather than in one fell swoop. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Crossrail and Tube upgrades spared the axe - NCE | London Transport | |||
Boris admits bendy-buses are safe - but he'll axe them anyway | London Transport | |||
Boris admits bendy-buses are safe - but he'll axe them anyway | London Transport | |||
Volvo FH12 500 6x4 Skogsbil / Timmerbil | London Transport | |||
GOBLIN ticket offices? | London Transport |