London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #6   Report Post  
Old May 18th 12, 11:32 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2010
Posts: 460
Default Tramlink doubling - Mitcham to Mitcham Junction

"Paul Corfield" wrote in message
...

Correct - it's my understanding that improved frequency is the reason
for the double tracking. I think the long term plan is to restore
double track on all of the Wimbledon line but Wimbledon station is a
particular problem.


Especially when you consider that the existing platform is also down for
changes in the London and SE RUS's proposal for 5 tracking the SWML from
from Surbiton; i.e. Thameslink will be displaced onto the current tram
platform.

No indications of where they'd move the trams, but some people might be
pleased if it removed the confusion about Oyster PAYG once and for all.
(As discussed here in uk.t.l now and again.)

Paul S
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Huge ramp at Mitcham Junction. What is it for? Offramp London Transport 4 March 25th 11 06:51 PM
Box Signal Box and Junction Road Junction Basil Jet London Transport 0 August 6th 09 01:14 AM
Mitcham Eastfields Open Paul Terry London Transport 31 June 3rd 08 11:58 PM
Mitcham Eastfields Mizter T London Transport 0 June 1st 08 01:53 PM
Mitcham Eastfields Batman55 London Transport 17 May 22nd 08 07:40 AM


All times are GMT. The time now is 10:52 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017