London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #2   Report Post  
Old September 30th 15, 09:56 PM
Senior Member
 
First recorded activity at LondonBanter: Feb 2011
Location: Leyton, East London
Posts: 902
Default

Quote:
Originally Posted by Basil Jet[_4_] View Post
.... the timescale was rumoured to be slipping, according to Modern
Railways, but the contract has now been let.

http://www.railtechnologymagazine.co...orewrite=false

I had no idea that Barking platform one was not electrified! Won't it
become disused when the Barking Reach extension is built?
I'm very pleased they have brought the costs down. As a resident of
Leyton I often find this service useful.

I didn't see any reference to platforms being lengthened. I assume
that will have to wait until patronage has increased. (If they re-opened
the route through to St. Pancras, patronage would increase very rapidly!)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
GOBLIN: FURTHER ELECTRIFICATION WORK. [email protected] London Transport 11 November 27th 17 02:29 PM
Goblin to close for Electrification work Jim Chisholm London Transport 12 February 18th 16 12:53 AM
Goblin electrification [email protected] London Transport 0 October 2nd 15 10:33 AM
Goblin electrification Mark Bestley[_2_] London Transport 0 October 2nd 15 10:16 AM
South Tottenham and GOBLIN electrification TheOneKEA London Transport 34 June 3rd 11 09:01 PM


All times are GMT. The time now is 01:56 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017