Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#3
|
|||
|
|||
Goblin electrification
Robin9 wrote:
'Basil Jet[_4_ Wrote: ;150369'].... the timescale was rumoured to be slipping, according to Modern Railways, but the contract has now been let. http://tinyurl.com/ns5psws I had no idea that Barking platform one was not electrified! Won't it become disused when the Barking Reach extension is built? I'm very pleased they have brought the costs down. As a resident of Leyton I often find this service useful. I didn't see any reference to platforms being lengthened. I assume that will have to wait until patronage has increased. (If they re-opened the route through to St. Pancras, patronage would increase very rapidly!) Are the platforms already long enough for four-car trains? |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
GOBLIN: FURTHER ELECTRIFICATION WORK. | London Transport | |||
Goblin to close for Electrification work | London Transport | |||
Goblin electrification | London Transport | |||
Goblin electrification | London Transport | |||
South Tottenham and GOBLIN electrification | London Transport |