London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #4   Report Post  
Old February 15th 16, 02:51 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Apr 2014
Posts: 23
Default ELL closure

On Monday, 15 February 2016 14:55:06 UTC, wrote:
Can you imagine any tube line being
closed for that many consecutive days now unless there had been a major
incident?


Yes, the Victoria line was closed from Seven Sisters to Walthamstow for 3 weeks last summer.

Closed all the way from Highbury down to Shadwell. Since TfL were apparently
too shortsighted to specify reversing points at Shortditch High Street when
the line was built and the route of crossrail was already known.


9 days seems a long time for trains to be cut off from their depot. Where would they be stabled and cleaned, and where would the drivers book on? (And where would they park their cars!)

  #5   Report Post  
Old February 15th 16, 02:59 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2011
Posts: 466
Default ELL closure

On 15/02/2016 15:51, Mark wrote:
On Monday, 15 February 2016 14:55:06 UTC, wrote:
Can you imagine any tube line being
closed for that many consecutive days now unless there had been a major
incident?


Yes, the Victoria line was closed from Seven Sisters to Walthamstow for 3 weeks last summer.

Closed all the way from Highbury down to Shadwell. Since TfL were apparently
too shortsighted to specify reversing points at Shortditch High Street when
the line was built and the route of crossrail was already known.


9 days seems a long time for trains to be cut off from their depot. Where would they be stabled and cleaned, and where would the drivers book on? (And where would they park their cars!)

Where does the NLL get its trains from? Surely for 9 days they could
rotate some of the sets in and out and guard them in stations overnight
or whatever?


  #6   Report Post  
Old February 15th 16, 03:30 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2015
Posts: 1,044
Default ELL closure

On Mon, 15 Feb 2016 07:51:10 -0800 (PST)
Mark wrote:
On Monday, 15 February 2016 14:55:06 UTC, wrote:
Can you imagine any tube line being
closed for that many consecutive days now unless there had been a major
incident?


Yes, the Victoria line was closed from Seven Sisters to Walthamstow for 3
weeks last summer.


Ok, major incident or major track repairs. And each of the affected stations
had an NR alternative. The closure of the ELL is nothing to do with the ELL
itself. Even a shuttle train would be better than nothing. But I guess its
easier to close the whole thing and sod the travelling public.

Closed all the way from Highbury down to Shadwell. Since TfL were apparently
too shortsighted to specify reversing points at Shortditch High Street when
the line was built and the route of crossrail was already known.


9 days seems a long time for trains to be cut off from their depot. Where
would they be stabled and cleaned, and where would the drivers book on? (And
where would they park their cars!)


Use the NLL depots obviously.

--
Spud

  #8   Report Post  
Old February 15th 16, 11:25 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default ELL closure

In article , (Basil Jet)
wrote:

On 2016\02\15 16:30,
d wrote:
On Mon, 15 Feb 2016 07:51:10 -0800 (PST)
Mark wrote:
On Monday, 15 February 2016 14:55:06 UTC, wrote:
Can you imagine any tube line being
closed for that many consecutive days now unless there had been a
major incident?

Yes, the Victoria line was closed from Seven Sisters to Walthamstow for
3 weeks last summer.


Ok, major incident or major track repairs. And each of the affected
stations had an NR alternative. The closure of the ELL is nothing to do
with the ELL itself. Even a shuttle train would be better than nothing.
But I guess its easier to close the whole thing and sod the travelling
public.

Closed all the way from Highbury down to Shadwell. Since TfL were
apparently too shortsighted to specify reversing points at Shortditch
High Street when the line was built and the route of crossrail was
already known.

9 days seems a long time for trains to be cut off from their depot.
Where would they be stabled and cleaned, and where would the drivers
book on? (And where would they park their cars!)


Use the NLL depots obviously.


Loads of space in them, is there? (I don't know if there is.)


They may now be regretting that the link to the NLL at Highbury & Islington
has never been commissioned because of the complications of the two
electrification systems. But available it is not so there is no way to run a
shuttle, even if Shoreditch High Street had a handy crossover.

--
Colin Rosenstiel
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
A stock after closure of ELL [email protected] London Transport 26 March 17th 07 03:09 PM
Weekend District/Circle Closure Paul Weaver London Transport 24 April 22nd 04 01:02 PM
Closure of Liverpool Street this morning Nicholas F Hodder London Transport 36 November 8th 03 10:39 AM
Five Day closure of Central Line (was surprised) Thomas Covenant London Transport 1 August 18th 03 08:35 AM
Success of Central Line Closure answer to Track Maintenance CJG London Transport 11 August 7th 03 09:11 PM


All times are GMT. The time now is 04:58 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017