London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #5   Report Post  
Old February 18th 16, 11:06 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2015
Posts: 1,044
Default ELL closure

On Thu, 18 Feb 2016 11:16:22 +0000
"Clive D. W. Feather" wrote:
In message , d wrote:
Can you imagine any tube line being
closed for that many consecutive days now unless there had been a major
incident?

Yes. Some examples (not an exhaustive list):

2009: Stonebridge Park to Queen's Park for 10 days.
2011: High Street Kensington to Edgware Road for about a month.
2012: Newbury Park to Grange Hill for 8 days.
2014: Uxbridge to Rayners Lane for over 3 weeks.
2014: Bow Church to Stratford for 10 days.
2015: Walthamstow Central to Seven Sisters for 3 weeks.


And exactly how many of those had nothing to do with the line itself but
was due to other work going on?


Irrelevant. In this case the closure is because there is risk from the


So the answer is none then. As I suspected.

Crossrail works in the vicinity. So that is "to do with the line
itself".


No, its to do with maybe 20m of the line at most. With a bit of foresight
(yes I know, its TfL, thats a big ask), they would have installed reversing
points at strategic locations and this would be a non issue.

Though it does prove TfL and LU are ****ing useless at major works. On the
mainline for a long closure thats not safety related they do generally single
line running and do one track at a time.


Rubbish.

While SLW is sometimes used (Farnworth tunnel being a clear example),
often the entire line is closed. Look at all the works over the last few
Christmases and Easters.


Xmas workings are different. Try normal weekday workings when trains are
wrong lined to bypass works. Do TfL think its xmas? Is that why the ELL is
closed?

--
Spud



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
A stock after closure of ELL [email protected] London Transport 26 March 17th 07 03:09 PM
Weekend District/Circle Closure Paul Weaver London Transport 24 April 22nd 04 01:02 PM
Closure of Liverpool Street this morning Nicholas F Hodder London Transport 36 November 8th 03 10:39 AM
Five Day closure of Central Line (was surprised) Thomas Covenant London Transport 1 August 18th 03 08:35 AM
Success of Central Line Closure answer to Track Maintenance CJG London Transport 11 August 7th 03 09:11 PM


All times are GMT. The time now is 06:49 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017