London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #3   Report Post  
Old October 22nd 16, 09:12 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2016
Posts: 1,071
Default Battersea extension


wrote in message ...
On Thu, 20 Oct 2016 18:56:06 -0500
wrote:
In article ,
d () wrote:

On Wed, 19 Oct 2016 18:39:46 -0500
wrote:
GTO electronics are seriously obsolete which could, I suspect, make
obtaining further sets quite hard. Note that some Networkers have had
their GTO controls replaced by Hitachi.

Surely if a manufacturer builds a train with a working life probably
exceeding at least 30 years then then should either guarantee a supply
of
parts for that time period or suffer penalties such as swallowing the
cost
of train upgrades if they can't? Even car manufacturers I believe are
by law required to be able to supply parts for their vehicles for a
minimum of 10 years in the USA & EU.


ROFL!


Well that was informative.


The problem with trying to guarantee replacement parts for electronic
components, is that your suppliers wont guarantee supply of their devices
for an extended length of time.

I recall once working on a project where one of the components that had been
selected for the product was obsoleted during the development phase and the
board had to be re-engineered with a newer component.

You can usually expect to get guaranteed supply for 5-7 years out of a
supplier, but more than that and you are stuck having to make alternative
arrangements. You might stretch a repair stock to 10-12 years by buying in
before an item becomes obsolete, but 30 years!

tim



  #5   Report Post  
Old October 22nd 16, 11:41 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Battersea extension

In article , (tim...)
wrote:

wrote in message
...
On Thu, 20 Oct 2016 18:56:06 -0500
wrote:
In article ,
d () wrote:

On Wed, 19 Oct 2016 18:39:46 -0500
wrote:
GTO electronics are seriously obsolete which could, I suspect, make
obtaining further sets quite hard. Note that some Networkers have had
their GTO controls replaced by Hitachi.

Surely if a manufacturer builds a train with a working life probably
exceeding at least 30 years then then should either guarantee a supply
of parts for that time period or suffer penalties such as swallowing
the cost of train upgrades if they can't? Even car manufacturers I
believe are by law required to be able to supply parts for their
vehicles for a minimum of 10 years in the USA & EU.

ROFL!


Well that was informative.


The problem with trying to guarantee replacement parts for electronic
components, is that your suppliers wont guarantee supply of their
devices for an extended length of time.

I recall once working on a project where one of the components that
had been selected for the product was obsoleted during the
development phase and the board had to be re-engineered with a newer
component.

You can usually expect to get guaranteed supply for 5-7 years out of
a supplier, but more than that and you are stuck having to make
alternative arrangements. You might stretch a repair stock to 10-12
years by buying in before an item becomes obsolete, but 30 years!


And with modern electronics, the timescales get shorter and shorter.

NRN radios were 1980s technology. We made lots of them when I worked at
Philips. By the end of the 1990s it wasn't even possible to manufacture the
radios any more because electronics as discrete components on circuit boards
were used any more. Replacement radio models hadn't been through the same
approval process necessary for safety assurance of railway control systems.

Yet radios manufactured back to the mid-80s are still today installed in
train cabs and used at least until recently. A substantial cottage industry
grew up finding and repairing such radios to keep the railway going. No
doubt the same sort of thing will have to happen with the successor GSM-R
technology.

--
Colin Rosenstiel


  #6   Report Post  
Old October 23rd 16, 10:01 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2013
Posts: 166
Default Battersea extension

On 23.10.2016 2:41 AM, wrote:
In article ,
(tim...)
wrote:

wrote in message
...
On Thu, 20 Oct 2016 18:56:06 -0500
wrote:
In article ,
d () wrote:

On Wed, 19 Oct 2016 18:39:46 -0500
wrote:
GTO electronics are seriously obsolete which could, I suspect, make
obtaining further sets quite hard. Note that some Networkers have had
their GTO controls replaced by Hitachi.

Surely if a manufacturer builds a train with a working life probably
exceeding at least 30 years then then should either guarantee a supply
of parts for that time period or suffer penalties such as swallowing
the cost of train upgrades if they can't? Even car manufacturers I
believe are by law required to be able to supply parts for their
vehicles for a minimum of 10 years in the USA & EU.

ROFL!

Well that was informative.


The problem with trying to guarantee replacement parts for electronic
components, is that your suppliers wont guarantee supply of their
devices for an extended length of time.

I recall once working on a project where one of the components that
had been selected for the product was obsoleted during the
development phase and the board had to be re-engineered with a newer
component.

You can usually expect to get guaranteed supply for 5-7 years out of
a supplier, but more than that and you are stuck having to make
alternative arrangements. You might stretch a repair stock to 10-12
years by buying in before an item becomes obsolete, but 30 years!


And with modern electronics, the timescales get shorter and shorter.

NRN radios were 1980s technology. We made lots of them when I worked at
Philips.


Hail well to a fellow Philips veteran! Ex PRL Redhill here).

I've got nothing of value to add... Err, ob.transport, I always use a train
when I visit friends/old Philips colleagues in Eindhoven (clutches at
straw...)
  #7   Report Post  
Old October 23rd 16, 02:54 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Battersea extension

In article , (Clank)
wrote:

On 23.10.2016 2:41 AM,
wrote:
In article ,

(tim...) wrote:

wrote in message
...
On Thu, 20 Oct 2016 18:56:06 -0500
wrote:
In article ,
d ()
wrote:

On Wed, 19 Oct 2016 18:39:46 -0500
wrote:
GTO electronics are seriously obsolete which could, I suspect,
make obtaining further sets quite hard. Note that some Networkers
have had their GTO controls replaced by Hitachi.

Surely if a manufacturer builds a train with a working life
probably exceeding at least 30 years then then should either
guarantee a supply of parts for that time period or suffer
penalties such as swallowing the cost of train upgrades if they
can't? Even car manufacturers I believe are by law required to be
able to supply parts for their vehicles for a minimum of 10 years
in the USA & EU.

ROFL!

Well that was informative.

The problem with trying to guarantee replacement parts for electronic
components, is that your suppliers wont guarantee supply of their
devices for an extended length of time.

I recall once working on a project where one of the components that
had been selected for the product was obsoleted during the development
phase and the board had to be re-engineered with a newer component.

You can usually expect to get guaranteed supply for 5-7 years out of
a supplier, but more than that and you are stuck having to make
alternative arrangements. You might stretch a repair stock to 10-12
years by buying in before an item becomes obsolete, but 30 years!


And with modern electronics, the timescales get shorter and shorter.

NRN radios were 1980s technology. We made lots of them when I worked at
Philips.


Hail well to a fellow Philips veteran! Ex PRL Redhill here).


You didn't make the Research Labs move to Cambridge then?

I've got nothing of value to add... Err, ob.transport, I always use a
train when I visit friends/old Philips colleagues in Eindhoven (clutches
at straw...)


Have you travelled on a Croydon tram? The original Bombardier Flexity fleet
still have their Simoco-branded FM1000 radios. Simoco had gone bust by the
time the tramway opened but I think Philips had to back the guarantees.

--
Colin Rosenstiel
  #10   Report Post  
Old October 25th 16, 12:08 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2006
Posts: 1,392
Default Battersea extension

On Mon, Oct 24, 2016 at 09:05:34AM +0100, Someone Somewhere wrote:

... GSM-R ...

Actually - I've just looked and they decided to use different
frequencies which introduced a level of protectionism that seems
unnecessary.


I was under the impression that that wasn't because of protectionism but
to avoid having to share crowded spectrum with the hundreds of people
sitting behind the driver.

--
David Cantrell | even more awesome than a panda-fur coat

Graecum est; non legitur


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Battersea extension [email protected] London Transport 80 October 19th 16 09:10 AM
Battersea Northern Line extension now done with a loan? Someone Somewhere London Transport 68 November 11th 13 08:56 PM
Battersea extension up in smoke? Jim Chisholm London Transport 28 December 6th 11 10:01 AM
Northern Line Extension To Battersea Paul London Transport 7 May 24th 11 06:36 PM
Piccadilly line extension to Terminal 5/Heathrow Express extension to T5 Martin Whelton London Transport 43 May 27th 04 08:40 AM


All times are GMT. The time now is 07:07 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017