London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #13   Report Post  
Old August 8th 17, 12:16 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Barking Riverside Extension approved

In article , (Basil Jet)
wrote:

On 2017\08\06 23:38, Paul Corfield wrote:

Inspector's report -

https://www.gov.uk/government/public...rking-riversid
e-extension-order-inspectors-report

4. Another interesting possibility of extending planned peak extra
trains from Enfield to Seven Sisters onwards to Barking via the S Tott
curve. As the trains will be common stock in future this would give 6
tph from S Tott to Barking in the peaks. No timescale given, though,
for this possible variant service.


The exact quote in the report is "TfL planners are already
considering diverting Enfield Town to Seven Sisters trains to
Barking." This might imply that the entire Enfield service would go
that way. Either way it seems odd... here's some passenger figures
from Wikipedia.

Bush Hill Park 0.992 million
Enfield Town 2.107 million

Southbury 0.834 million
Turkey Street 0.604 million
Theobald's Grove 0.352 million

(I can't get figures for Cheshunt Overground only, but it has faster
trains to the Victoria Line and to Liverpool Street via Tottenham
Hale.)

So Enfield Town alone has more than the three Southbury Loop stations.

I think Enfield Town needs 8-car trains from Liverpool Street, and
the Southbury Loop should get the 4-car trains from Barking.


But these are "planned extra trains" from Enfield Town, so on top of the
current 4 trains hourly in the peak when Cheshunt and the Southbury loop
only get half-hourly trains. Enfield Town also has 3 platforms to reverse
trains in while Cheshunt just has one for LO services.

--
Colin Rosenstiel
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
A foot and cycle bridge across Barking Creek as part of the DLRDagenham Dock extension? Tom Anderson London Transport 16 December 5th 08 05:52 PM
Piccadilly line extension to Terminal 5/Heathrow Express extension to T5 Martin Whelton London Transport 43 May 27th 04 08:40 AM
Crossrail funding approved Matthew Malthouse London Transport 25 July 27th 03 12:02 PM


All times are GMT. The time now is 07:29 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017