Default Extra Carraige on the Edware Road branch?

I was supprised today to read in the leaflet for the conservative
candidate in Putney that:

"LU have agreed to add an extra carriage to Edgware Road tubes"

Is this possible? I thought the platforms were shorter beyond High St
Ken? Where are the carriages coming from - will there be less but
longer trains?

Or did she make it up?

--
Chris


  #2   Report Post  
Old April 23rd 05, 02:01 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,158
Default Extra Carraige on the Edware Road branch?

Chris! wrote:
I was supprised today to read in the leaflet for the conservative
candidate in Putney that:

"LU have agreed to add an extra carriage to Edgware Road tubes"

Is this possible? I thought the platforms were shorter beyond High St
Ken? Where are the carriages coming from - will there be less but
longer trains?

Or did she make it up?


The new common subsurface stock, due in 2011ish, will have walk-through
connections between carriages, and I believe it will have shorter
carriages too - presumably enabling it to run anywhere on the subsurface
network. Someone may be along shortly to correct me.

What I doubt is that any particular MP had anything to do with the
specification of the new SSL trains.

--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London
  #5   Report Post  
Old April 24th 05, 12:42 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Apr 2005
Posts: 140
Default Extra Carraige on the Edware Road branch?


Colin Rosenstiel wrote:
In article .com,
(Chris!) wrote:
Or did she make it up?


If it's like content in other leaflets of hers I saw, I expect so.


It did suprise me that she says she will campaign for signal / track
replacement on the branch yet apparently this is happening on the
20th-23rd May anyway

--
Chris



  #6   Report Post  
Old April 24th 05, 08:11 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 3,995
Default Extra Carraige on the Edware Road branch?

On Sat, 23 Apr 2005 15:01:32 +0100, Dave Arquati wrote:

Chris! wrote:
I was supprised today to read in the leaflet for the conservative
candidate in Putney that:

"LU have agreed to add an extra carriage to Edgware Road tubes"

Is this possible? I thought the platforms were shorter beyond High St
Ken? Where are the carriages coming from - will there be less but
longer trains?

Or did she make it up?


The new common subsurface stock, due in 2011ish, will have walk-through
connections between carriages, and I believe it will have shorter
carriages too - presumably enabling it to run anywhere on the subsurface
network. Someone may be along shortly to correct me.

What I doubt is that any particular MP had anything to do with the
specification of the new SSL trains.


IIRC there is a contract option to allow for 7 car instead of 6 car
operation on the Circle, H&C and Wimbleware part of the SSL network. I
think the prospective parliamentary candidate may be referring to that.
I shall have to check to see if LUL has exercised that option or not.

--
Paul C


Admits to working for London Underground!

  #7   Report Post  
Old April 24th 05, 10:08 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Apr 2005
Posts: 140
Default Extra Carraige on the Edware Road branch?


Paul Corfield wrote:
IIRC there is a contract option to allow for 7 car instead of 6 car
operation on the Circle, H&C and Wimbleware part of the SSL network.

I
think the prospective parliamentary candidate may be referring to

that.
I shall have to check to see if LUL has exercised that option or not.


Hi Paul,

Thanks

Would those 7 cars be the same total length as the current 6 then? Or
would platforms need extending? Or am I completely wrong in thinking
the current 6 car ones fill the platform at some stations.

--
Chris

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Lengthening trains on the circle and Edgeware road branch of theDistrict lines Stef Richards London Transport 2 December 16th 06 05:35 PM
DfT consults on extra rail powers for Mayor TravelBot London Transport News 0 March 12th 06 07:40 PM
"Extra" buses [email protected] London Transport 23 December 27th 05 09:31 PM
Thabks to Chiltern - but how about extra carriages? CharlesPottins London Transport 14 January 17th 05 10:55 AM
Curious extra station stops on Southern's Watford-Brighton service LarryLard London Transport 5 July 3rd 04 10:34 AM


All times are GMT. The time now is 04:43 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017