London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #8   Report Post  
Old July 16th 03, 08:21 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default Dot Matrix replaces big boards at L/Pool St

CJG wrote in message ...
In message , Boltar
writes
with a company that takes 9 months to fix an escalator nothing comes as
a surprise anymore...


Isn't it taking 18months at Marylebone to replace or fix or whatever
they are doing to it?



More than likely. It took them 3 years to sort out all the escalators at
Holborn. Considering it took far less time than that to originally build the
station including installing the escalators you can only laugh at the absurdity
of it all.

B2003
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Dot Matrix Displays at Turnpike Lane Phil Richards London Transport 6 March 13th 07 08:57 AM
Dot matrix displays Tristán White London Transport 16 January 24th 07 09:33 AM
advice please - pool inside M25 for tour team stay jtaylor London Transport 3 March 11th 05 05:57 PM
Liverpool St Circle dot-matrix indicators Steve London Transport 1 November 14th 03 08:09 PM
West Ham district line dot matrix Robin May London Transport 1 September 9th 03 11:16 PM


All times are GMT. The time now is 01:11 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017