Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#4
|
|||
|
|||
Waterloo & City Line to Close for 5 Months
In message , at
00:50:18 on Wed, 28 Sep 2005, Richard J. remarked: According to CULG, it closed on 28 May 1993 for conversion to 4-rail operation, and reopened on 19 Jul 1993. I assume this was when the ex-Southern Railway Class 487 were replaced by Class 482, aka 92ts. They also did some work to the tunnel lining, but didn't fix *everything* - there were still a couple of places where it was uncomfortably close. This was all explained at their 100 year exhibition. -- Roland Perry |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Tower Bridge To Close For 3 Months | London Transport | |||
Waterloo & City line crane operation this weekend... | London Transport | |||
Waterloo & City line | London Transport | |||
Waterloo & City Line Car Lift Operation | London Transport | |||
LU to close Waterloo&City line to save money. | London Transport |