London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old July 3rd 07, 04:35 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default DLR - Stratford International construction contract

The contract for the main works from Stratford International to Canning Town
(except for the flyover junctions) has just been awarded to
Skanska/Grantrail.

http://developments.dlr.co.uk/extens...ails.asp?id=38

Without repeating the arguments about the neccessity of the North Woolwich
closure, is there any practical reason why the line couldn't have remained
in use for the last 6 months?

Paul


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
DLR Stratford International Paul Corfield London Transport 3 July 22nd 10 01:45 PM
DLR Stratford International Roland Perry London Transport 8 July 20th 10 09:34 PM
Work to start on DLR from Canning Town to Stratford International John Rowland London Transport 31 January 21st 07 01:37 PM
NLL Closure / DLR to Stratford International Paul Corfield London Transport 32 November 25th 06 12:05 AM
DLR or Jubilee line extension to Stratford International - two questions Bob Robinson London Transport 7 May 4th 04 10:43 PM


All times are GMT. The time now is 08:46 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017