The contract for the main works from Stratford International to Canning Town
(except for the flyover junctions) has just been awarded to
Skanska/Grantrail.

http://developments.dlr.co.uk/extens...ails.asp?id=38

Without repeating the arguments about the neccessity of the North Woolwich
closure, is there any practical reason why the line couldn't have remained
in use for the last 6 months?

Paul



  #2   Report Post  
Old July 3rd 07, 05:56 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2006
Posts: 942
Default DLR - Stratford International construction contract

On 3 Jul, 17:35, "Paul Scott" wrote:
The contract for the main works from Stratford International to Canning Town
(except for the flyover junctions) has just been awarded to
Skanska/Grantrail.

http://developments.dlr.co.uk/extens...ails.asp?id=38

Without repeating the arguments about the neccessity of the North Woolwich
closure, is there any practical reason why the line couldn't have remained
in use for the last 6 months?


At a guess because of:

"A separate £39m contract comprising the extension's enabling works,
which included track alignment and the construction of the foundations
and shell of the Docklands Light Railway Stratford International
station, was similarly awarded to a Skanska and GrantRail joint
venture in January 2007."

In other words, the contractors have been doing preliminary work on
the old NLL line since it closed, and have now been awarded the main
building phase as well.

--
John Band
john at johnband dot org
www.johnband.org

  #3   Report Post  
Old July 3rd 07, 06:01 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default DLR - Stratford International construction contract


"John B" wrote in message
oups.com...
On 3 Jul, 17:35, "Paul Scott" wrote:
The contract for the main works from Stratford International to Canning
Town
(except for the flyover junctions) has just been awarded to
Skanska/Grantrail.

http://developments.dlr.co.uk/extens...ails.asp?id=38

Without repeating the arguments about the neccessity of the North Woolwich
closure, is there any practical reason why the line couldn't have remained
in use for the last 6 months?


At a guess because of:

"A separate £39m contract comprising the extension's enabling works,
which included track alignment and the construction of the foundations
and shell of the Docklands Light Railway Stratford International
station, was similarly awarded to a Skanska and GrantRail joint
venture in January 2007."

In other words, the contractors have been doing preliminary work on
the old NLL line since it closed, and have now been awarded the main
building phase as well.


I don't think anything has been done at all south of Stratford Regional, the
earlier contract is all at the Stratford International site, isn't it?
Perhaps someone nearer to what's going on could clarify...

Paul


  #4   Report Post  
Old July 3rd 07, 06:40 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2003
Posts: 829
Default DLR - Stratford International construction contract

In message , Paul Scott
writes

I don't think anything has been done at all south of Stratford Regional, the
earlier contract is all at the Stratford International site, isn't it?


There was a third contract, awarded to Atkins, for "termination of the
North London Line". I imagine that means removal of track, signalling,
lineside equipment, buildings, etc. Work began on this in January.

Perhaps someone nearer to what's going on could clarify...


I've not been there, but the DLR website mentioned earlier says that
Atkins finished their de-commissioning work last week.
--
Paul Terry


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
DLR Stratford International Paul Corfield London Transport 3 July 22nd 10 02:45 PM
DLR Stratford International Roland Perry London Transport 8 July 20th 10 10:34 PM
Work to start on DLR from Canning Town to Stratford International John Rowland London Transport 31 January 21st 07 02:37 PM
NLL Closure / DLR to Stratford International Paul Corfield London Transport 32 November 25th 06 01:05 AM
DLR or Jubilee line extension to Stratford International - two questions Bob Robinson London Transport 7 May 4th 04 11:43 PM


All times are GMT. The time now is 10:00 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017