Default Catenary in drayton park - moorgate tunnels?

For the first time today I waited on the southbound line to moorgate
at highbury. I noticed above the track there was what looked like
catenary strung up above the track all the way along and then it
disappeared into the tunnels. It also looked pretty old and given the
lack of any serious insulators theres no way it could be 25Kv. So was
it some abortive attempt at 750v DC overhead or was it something else
entirely?

B2003


  #2   Report Post  
Old September 11th 07, 09:40 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jun 2006
Posts: 46
Default Catenary in drayton park - moorgate tunnels?

On 11 Sep, 09:54, Boltar wrote:
For the first time today I waited on the southbound line to moorgate
at highbury. I noticed above the track there was what looked like
catenary strung up above the track all the way along and then it
disappeared into the tunnels. It also looked pretty old and given the
lack of any serious insulators theres no way it could be 25Kv. So was
it some abortive attempt at 750v DC overhead or was it something else
entirely?


It is an unpowered overrun wire, to guard against a train running with
a raised pantograph. It was installed at the time of the BR takeover
of the line.

  #3   Report Post  
Old September 11th 07, 10:11 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default Catenary in drayton park - moorgate tunnels?

On Sep 11, 10:40 am, wrote:
It is an unpowered overrun wire, to guard against a train running with
a raised pantograph. It was installed at the time of the BR takeover
of the line.


How far does it run? I don't remember seeing it at Moorgate.

B2003


  #4   Report Post  
Old September 11th 07, 11:26 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default Catenary in drayton park - moorgate tunnels?

On 11 Sep, 11:11, Boltar wrote:
On Sep 11, 10:40 am, wrote:

It is an unpowered overrun wire, to guard against a train running with
a raised pantograph. It was installed at the time of the BR takeover
of the line.


How far does it run? I don't remember seeing it at Moorgate.

B2003


I'll guess not far - as aren't the traction systems interlocked so
that when a driver changes to third-rail at Draytom Park the
pantograph gets lowered. In which case the unpowered overrun line just
needs to exist for as far as the train could coast for until it ground
to a powerless halt!

I don't think any driver doing this would make themselves at all
popular, given the 10 minute service frequency that operates to and
from Moorgate in the Great Northern tunnels!

  #5   Report Post  
Old September 11th 07, 06:26 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2004
Posts: 341
Default Catenary in drayton park - moorgate tunnels?

On Sep 11, 7:26 am, Mizter T wrote:
I'll guess not far - as aren't the traction systems interlocked so
that when a driver changes to third-rail at Drayton Park the
pantograph gets lowered. In which case the unpowered overrun line just
needs to exist for as far as the train could coast for until it ground
to a powerless halt!


The overrun line ends south of Highbury s/b platform.


I don't think any driver doing this would make themselves at all
popular, given the 10 minute service frequency that operates to and
from Moorgate in the Great Northern tunnels!


At least in this case the driver can switch to 750V DC and incur only
a medium delay, as opposed to running entirely off the juice.



  #6   Report Post  
Old September 11th 07, 08:08 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default Catenary in drayton park - moorgate tunnels?

On 11 Sep, 19:26, TheOneKEA wrote:
On Sep 11, 7:26 am, Mizter T wrote:

I'll guess not far - as aren't the traction systems interlocked so
that when a driver changes to third-rail at Drayton Park the
pantograph gets lowered. In which case the unpowered overrun line just
needs to exist for as far as the train could coast for until it ground
to a powerless halt!


The overrun line ends south of Highbury s/b platform.

I don't think any driver doing this would make themselves at all
popular, given the 10 minute service frequency that operates to and
from Moorgate in the Great Northern tunnels!


At least in this case the driver can switch to 750V DC and incur only
a medium delay, as opposed to running entirely off the juice.


Yes, stupidly I'd overlooked that! In which case it wouldn't be a
problem - in fact who else apart from the driver and pax would know
about it. Maybe it happens all the time!

  #8   Report Post  
Old September 13th 07, 05:20 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jun 2006
Posts: 46
Default Catenary in drayton park - moorgate tunnels?

On 12 Sep, 00:05, (Colin Rosenstiel) wrote:

An overrun all the way from Drayton Park to Highbury and Islington?
Surely not?


It runs as far as the south end of H&I SB platform.

Having it in the platform means that a train that has entered the
tunnel pan up can be visually inspected, and that the AC-DC changeover
can be cycled through (i.e pan down if still raised, go DC, go AC pan
up onto dead line, go DC.).


  #9   Report Post  
Old September 16th 07, 09:43 AM
Junior Member
 
First recorded activity at LondonBanter: May 2007
Posts: 20
Default

Quote:
Originally Posted by Mizter T View Post
On 11 Sep, 11:11, Boltar wrote:
On Sep 11, 10:40 am, wrote:

It is an unpowered overrun wire, to guard against a train running with
a raised pantograph. It was installed at the time of the BR takeover
of the line.


How far does it run? I don't remember seeing it at Moorgate.

B2003


I'll guess not far - as aren't the traction systems interlocked so
that when a driver changes to third-rail at Draytom Park the
pantograph gets lowered. In which case the unpowered overrun line just
needs to exist for as far as the train could coast for until it ground
to a powerless halt!

I don't think any driver doing this would make themselves at all
popular, given the 10 minute service frequency that operates to and
from Moorgate in the Great Northern tunnels!
In the cab there is a buzzer that sounds if the driver tries to take power with both AC and DC power available. At the Finsbury Park end of Drayton Park there is a button to switch off the buzzer. There is not one at the Moorgate end.
  #10   Report Post  
Old September 23rd 07, 05:54 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 26
Default Catenary in drayton park - moorgate tunnels?

On Sep 11, 10:40 am, wrote:
On 11 Sep, 09:54, Boltar wrote:

For the first time today I waited on the southbound line to moorgate
at highbury. I noticed above the track there was what looked like
catenary strung up above the track all the way along and then it
disappeared into the tunnels. It also looked pretty old and given the
lack of any serious insulators theres no way it could be 25Kv. So was
it some abortive attempt at 750v DC overhead or was it something else
entirely?


It is an unpowered overrun wire, to guard against a train running with
a raised pantograph. It was installed at the time of the BR takeover
of the line.


That's odd; Rails Through The Clay suggested it was installed as an
afterthought when someone forgot to lower the pantograph and ended up
causing a bit of damage.



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Drilling breach into F Park - Moorgate tunnels Richard J.[_3_] London Transport 0 March 31st 13 01:21 PM
Drayton Park [email protected] London Transport 30 February 18th 11 12:51 PM
Drayton park old tunnels Boltar London Transport 8 October 29th 07 10:50 PM
Single track line next to Drayton Park station Boltar London Transport 4 August 2nd 07 08:13 AM
Drayton Park sighting (long shot!) [email protected] London Transport 1 April 20th 06 10:13 AM


All times are GMT. The time now is 11:05 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017