London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #7   Report Post  
Old November 20th 07, 04:30 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 3,995
Default Walthamstow Central

On Wed, 14 Nov 2007 20:40:34 +0000, Paul Corfield
wrote:

Walthamstow Central tube is closed this Saturday and the Vic line is
closed Sunday. Having pondered the reason why I asked this evening as to
whether the subway link was due to open. The worksite looks perilously
close to "break through" of the final bits of the wall.


And having used Walthamstow this evening I can confirm that both the
ticket office and the subway link are open.

The office protrudes a little into the ticket hall but has a full glass
frontage with some side panes mirrored. The window is designed to serve
both sides of the gateline which has been realigned with the manual gate
back by the office.

The link subway is open and you descend about 8 steps into the subway. A
Multi fare and 2 advanced fare machines (converted few fares) are in the
new POM enclosure. Half away along the subway are automatic fire doors.
You then face a mountain range of steps up into the bus station! At
present the r/h side walkway to the lift is caged off - this is no
surprise given the upper landing is behind hoardings as well. Once up
the stairs you step out into the bus station without getting wet - much
appreciated today. Much less conflict between pedestrians and buses at
the bus station exit which is a blessing. It's also possible to walk
under cover from almost the high street right to the Liverpool St
platforms for "one" services which I think people will find very
convenient.

There were porters provided at both ends of the subway link - presumably
to assist those laden with bags or pushchairs / buggies. What I could
not tell was whether there is a mini lift at the ticket hall end of the
subway or not.

Nice to see it almost finished - just the lift to go.

--
Paul C


Admits to working for London Underground!
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
FastTicket machine at Walthamstow Central? Jarle Hammen Knudsen London Transport 8 March 15th 17 04:08 PM
Walthamstow Central update Paul Corfield London Transport 12 October 6th 07 07:23 PM
Walthamstow Central - bus station to tube subway Harry G London Transport 15 September 21st 06 08:43 AM
Oyster now available from WAGN @ Walthamstow Central Jason London Transport 4 February 29th 04 07:42 PM
Walthamstow Redevelopment simon London Transport 1 January 21st 04 05:58 PM


All times are GMT. The time now is 11:19 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017