Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#7
![]() |
|||
|
|||
![]()
"Paul Scott" wrote in message
... "One issue still being debated is whether to grade separate Metropolitan Junction, where FCC services now leave Southeastern's intensively used LB - Waterloo line for Blackfriars." I would have thought this problem [of Thameslink & SE services crossing] had been completely designed out by moving the crossing point to the diveunders east of London Bridge, and then having dedicated pairs of tracks westward of London Bridge for both the Blackfriars and Charing Cross routes. Since Blackfriars is going to be closed for a considerable length of time, almost three years, will LUL put up partitions at the platform edges and allow trains to run through there at speed? What would it take to reset the start signals to normal waysides, since now they are in essence draw ups. Also when from where is the last Thameslink train on the Moorgate Branch due to depart on 22 March? |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Why did the Metropolitan Railway go to Verney Junction? | London Transport | |||
Box Signal Box and Junction Road Junction | London Transport | |||
Exciting news on Thameslink 2000 (now "Thameslink Project") | London Transport | |||
Metropolitan T stock | London Transport | |||
Metropolitan Line Questions | London Transport |