London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #20   Report Post  
Old July 23rd 09, 07:40 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Dec 2008
Posts: 2,008
Default First passenger service journey for LUL 09 stock

"Tom Anderson" wrote in message
rth.li
On Thu, 23 Jul 2009, Peter Masson wrote:

"Tom Barry" wrote

If they'd only had aircon...


Among the problems with aircon on the tube lines is - where do you
dump the heat? Presumably on, say, the Central or Piccadilly lines
it would be possible to devise a system whereby the heat was
retained on the train until it got to the open air, and then dumped,
but Victoria Line trains stay underground all the time they are in
service. No use cooling the trains if you just heat the tunnels even
more.


You'd have to install a fake open air. By which i mean some point on
the line where trains could stop and offload their heat - some
apparatus they sit inside which blows a gale of super-cooled damp air
(or even water) into their heat exchangers, and sucks the warmed
exhaust out again. You wouldn't want to do it in passenger service,
but if you could build ten minutes into the schedule at one end, it
could be done during turn-around. Admittedly, this would involve
changing the Victoria operating principle quite a bit, but at least
it's technically feasible. Ish.


I think it makes a lot more sense to just take more heat out of the
stations and maybe the tunnels as well. That means more surface
ventilation fans running (which is think is already happening) and some
sort of additional cooling, such as the plan to use heat exchangers with
the cold ground water being pumped out. That way, the passengers in the
stations benefit as well, and you don't need to complicate the already
cramped trains any more than they are already.




 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
LUL Movia S stock impressions G1206 London Transport 4 December 24th 10 10:35 AM
LUL New Stock design Q London Transport 3 March 13th 09 10:25 PM
Passenger door buttons gone on refurb D Stock Boltar London Transport 74 February 23rd 07 04:08 PM
NetWork RailCard - Must an accompanying Passenger "accompany" the CardHolder for the Entire Journey. PHH699 London Transport 3 October 17th 06 03:33 PM
LUL rolling stock question Julian Hayward London Transport 2 October 23rd 04 12:09 AM


All times are GMT. The time now is 01:34 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017