Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#6
![]() |
|||
|
|||
![]()
On Jul 31, 7:48*pm, D7666 wrote:
On Jul 31, 4:12*pm, 1506 wrote: If they would fit the loading guage, these trains would seem ideal for District and Circle Lines. nitpick As I understand the term, a 378 does fit the loading gauge ... because the term loading gauge refers to the train itself ... so a 378 always fits itself ![]() The comment I think should be ... if 378s would fit the SSL structure gauge with sufficient clearance. However, it is a Friday and I have a reputation of pedant to maintain ... and I knew exactly what you meant ![]() / nitpick Isn't it the case that the loading gauge is the maximum size of train allowed to fit with the structure gauge. A train has to fit the defined loading gauge for the route and this means it will automatically within the structure gauge (plus clearance). So in the UK we have routes being modifed to a W9 or W10 loading gauge for the passage of the larger (9'6") shipping containers. In some places this modification can be as simple as introducing a speed restriction through a tight spot. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Overground stock | London Transport | |||
Overground stock | London Transport | |||
More Overground closures... | London Transport | |||
More Overground trains | London Transport | |||
Overground new stock | London Transport |