Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
|
LinkBack | Thread Tools | Display Modes |
|
#1
|
|||
|
|||
Wandsworth Town station gateline
I don't know why they couldn't have foreseen it, but when I saw those
four gates being installed at Wandsworth town a week or two ago I knew that could never be enough. They're been put into use today and it's just causing so many problems already with queues all the way up the stairs onto the platforms almost. This is a very busy station with a narrow corridor that can only take 3 normal + 1 wide gate which is just nowhere near enough. They could've maybe built something in a semi-circle at the very end of the corridor which would allow for a couple of extra gates? Because is just not going to work. |
#2
|
|||
|
|||
Wandsworth Town station gateline
Lucas wrote:
I don't know why they couldn't have foreseen it, but when I saw those four gates being installed at Wandsworth town a week or two ago I knew that could never be enough. They're been put into use today and it's just causing so many problems already with queues all the way up the stairs onto the platforms almost. This is a very busy station with a narrow corridor that can only take 3 normal + 1 wide gate which is just nowhere near enough. They could've maybe built something in a semi-circle at the very end of the corridor which would allow for a couple of extra gates? Because is just not going to work. I've seen several ticket gate installations of late where I can't see how the guidance notes for the Railway Group Standards have been followed at all. http://www.rgsonline.co.uk/Railway_G...%20Iss%201.pdf How binding are these on the TOCs? Can we report this to anyone? |
#3
|
|||
|
|||
Wandsworth Town station gateline
On 5 Aug, 12:59, Commuter wrote:
Lucas wrote: I don't know why they couldn't have foreseen it, but when I saw those four gates being installed at Wandsworth town a week or two ago I knew that could never be enough. They're been put into use today and it's just causing so many problems already with queues all the way up the stairs onto the platforms almost. This is a very busy station with a narrow corridor that can only take 3 normal + 1 wide gate which is just nowhere near enough. They could've maybe built something in a semi-circle at the very end of the corridor which would allow for a couple of extra gates? Because is just not going to work. I've seen several ticket gate installations of late where I can't see how the guidance notes for the Railway Group Standards have been followed at all. http://www.rgsonline.co.uk/Railway_G...astructure/Gui... How binding are these on the TOCs? Can we report this to anyone? Just reading this now: Ensure sufficient ATGs are installed at each entrance/exit to ensure no person has to wait more than a maximum of five minutes to pass through the ATGs. This figure has been applied to all ATG schemes installed on the national rail network to date, although station operators should aim to achieve a waiting time of no more than three minutes. 5 minutes of extra waiting time to get through a gate? Who on earth thinks that's an acceptable extra burden for every passenger? I would say 10 or 20 seconds extra, max. |
#4
|
|||
|
|||
Wandsworth Town station gateline
On Wed, Aug 05, 2009 at 04:02:30PM +0100, Paul Corfield wrote:
On LUL we plan to make sure that the gates are not an evacuation route pinch point and also that there are sufficient gates for the highest peak 5 minute combined flow rate. This should mean there is very little queuing at a gateline although I recognise some locations fare better than others in this respect. Quite. I can't remember the last time I was seriously delayed *leaving* a tube station. And yet it happens just about every time I have to go through barriers at Victoria. At Thornton Heath, they did what the OP suggested should have been done at Wandsworth Town - set the gates back where there was more space. They still cause delays and crowding though when they're in use. Thankfully, they're just left open nearly every evening. And I maintain that there should be giant hydraulic spikes shooting up through the floor whenever a passenger is too ****ing stupid to work the gate. -- David Cantrell | Official London Perl Mongers Bad Influence "IMO, the primary historical significance of Unix is that it marks the time in computer history where CPUs became so cheap that it was possible to build an operating system without adult supervision." -- Russ Holsclaw in a.f.c |
#5
|
|||
|
|||
Wandsworth Town station gateline
David Cantrell writes:
And I maintain that there should be giant hydraulic spikes shooting up through the floor whenever a passenger is too ****ing stupid to work the gate. I'm not sure how that would decrease congestion at the barrier. Steam catapult? -dan |
#6
|
|||
|
|||
Wandsworth Town station gateline
On Thu, Aug 06, 2009 at 11:59:49AM +0100, Daniel Barlow wrote:
David Cantrell writes: And I maintain that there should be giant hydraulic spikes shooting up through the floor whenever a passenger is too ****ing stupid to work the gate. I'm not sure how that would decrease congestion at the barrier. Steam catapult? It wouldn't solve it immediately, but over a few days or weeks it would weed the troublemakers out of the population. -- David Cantrell | Minister for Arbitrary Justice Languages for which ISO-Latin-$n is not necessary, #1 in a series: Latin |
#7
|
|||
|
|||
Wandsworth Town station gateline
|
#9
|
|||
|
|||
Wandsworth Town station gateline
"Paul Corfield" wrote in message
... Quite. I can't remember the last time I was seriously delayed *leaving* a tube station. And yet it happens just about every time I have to go through barriers at Victoria. I think the fact that £700m is to be spent expanding capacity at Victoria is indicative that the place is seriously below capacity hence the queuing time. I thought David was commenting on how long it took to get through the *NR* barriers at Victoria. Nonetheless I suspect the 5 minute delay parameter might apply for NR terminal stations. The only NR barrier line I use regularly is the one serving platforms 15-19 at Victoria, and this is the only one I've encountered that seems to have acceptable capacity in the morning peak. It only fails on the rare occassions that two full trains arrive simultaneously - they usually open all the gates and shout at people to walk through. D A Stocks |
#10
|
|||
|
|||
Wandsworth Town station gateline
On Thu, Aug 06, 2009 at 01:40:13PM +0100, Paul Corfield wrote:
On Thu, 06 Aug 2009 06:14:21 -0500, wrote: In article , (David Cantrell) wrote: On Wed, Aug 05, 2009 at 04:02:30PM +0100, Paul Corfield wrote: On LUL we plan to make sure that the gates are not an evacuation route pinch point and also that there are sufficient gates for the highest peak 5 minute combined flow rate. This should mean there is very little queuing at a gateline although I recognise some locations fare better than others in this respect. Quite. I can't remember the last time I was seriously delayed *leaving* a tube station. And yet it happens just about every time I have to go through barriers at Victoria. I think the fact that £700m is to be spent expanding capacity at Victoria is indicative that the place is seriously below capacity hence the queuing time. I meant the National Rail station, BTW. There's often delays getting off their platforms, especially at platforms 9-12. The choke point there is between platform and concourse. I've never noticed any problems getting in and out of the station itself. That particular choke point would go away if they knocked down the shops selling junk food. I doubt it would cost more than ten grand to knock 'em down, cart away the rubbish, and make good the new floor space. OK, 100 grand and it'll take twice as long for a worse job, cos it's the public sector and they have to use a "preferred contractor" instead of Wladislaw Unpronouncablowski from down the pub. -- David Cantrell | Enforcer, South London Linguistic Massive What profiteth a man, if he win a flame war, yet lose his cool? |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Stratford Jubilee gateline defunct | London Transport | |||
Waterloo gateline | London Transport | |||
City Thameslink gateline | London Transport | |||
Wandsworth Town | London Transport | |||
Wandsworth Town | London Transport |